Entering content frameProduct Cost Collector Material/Production Plant/Planning Plant: Constraints Locate the document in its SAP Library structure

Product cost collectors with the Controlling level Production Plant/Planning Plant have a number of special features:

This means that in repetitive manufacturing no confirmations on the basis of the activity quantities of the preliminary cost estimate are possible.

In repetitive manufacturing, work in process at target costs for a product cost collector with the characteristics Material/Production Plant/Planning Plant is only possible under the following conditions:

Example

You have assigned multiple run schedule headers to a product cost collector with the characteristics Material/Production Plant/Planning Plant. The production version specified in run schedule header 1 specifies a routing with the same task list type and task list group on which the material cost estimate relevant for WIP calculation is based.

The production version specified in run schedule header 2 specifies a routing with a different task list type.

The production version specified in run schedule header 3 specifies a routing with a different task list group.

You enter reporting point backflushes. You perform WIP calculation during the period-end closing activities. The system calculates work in process. The work in process reported shows the value of the work in process for run schedule header 1. The system cannot calculate any work in process for run schedule headers 2 and 3.

See also:

Preliminary Cost Estimates for Product Cost Collectors

Work in Process in Product Cost by Period

Variance Calculation

 