Proceed as follows to replace a work center in all or a large number of routings:
You reach the Replace Work Center: Selection screen.
If you specify a key date, the system only selects operations valid on this date. If you do not enter a key date, the system displays all operations in which the work center is used.
Enter the task list types for which you want to generate a where-used list. Note that you cannot make a generic entry in the type from fields.
You can narrow down the search by entering the following data:
– status
– usage
– routing plant
– group
– material number
– material short text
You reach the Enter overview variant dialog box. Enter the desired overview variant and press Continue.
You see a list of all routings and routing objects in which the work center is used.
If you want to replace the work centers using a batch input session, select the menu options Settings
The system replaces the old work center in the selected headers, sequences and operations with the new work center.
If the work center cannot be replaced in all selected objects, you receive a system message. The objects in which it has not been replaced are marked by the system. Try to replace the work center again.
See also:
Displaying Usage in Deleted Task Lists