Entering content frameConceptual documentation Sub-Operation Dates Locate the document in its SAP Library structure

Sub-operations are not divided into individual operation segments in scheduling. The system schedules start and finish dates for the sub-operations from their reference dates.

To define the start and the finish of a sub-operation, you must maintain the following data on the Operation Details screen:

Note

If you have not maintained scheduling data for a sub-operation, the start date of setup and the finish date of execution are transferred to the sub-operation.

 

 

 