Entering content frameProcedure documentation Editing and Printing the Log Locate the document in its SAP Library structure

  1. Changing Display Variants
  2. Display variants enable you to specify which information is to be displayed in a list (such as the log). To change the current display variant or create your own, choose This graphic is explained in the accompanying text (in certain logs, you can also choose This graphic is explained in the accompanying text with the quick info Current Display Variant, This graphic is explained in the accompanying text Display Variant and This graphic is explained in the accompanying text Save).

    Display variants enable you to display additional fields (such as the area of responsibility or grouping term), or hide unnecessary ones, and so adapt the list to suit your requirements. For more information, see Functions of the ABAP List Viewer.

  3. Sorting the Log
    1. To sort the messages in the log, select the column(s) to be sorted and choose This graphic is explained in the accompanying text to sort in ascending order or This graphic is explained in the accompanying text to sort in descending order.
    2. To create a partial list from the complete list of messages for each message type, area of responsibility, material, or grouping term, select a column and choose This graphic is explained in the accompanying text. You can select several columns by holding down the Ctrl button.
  1. Displaying the Long Text
  2. If you want to go to the long text of a message, place the cursor on the desired line and choose This graphic is explained in the accompanying text. The long text of a message (particularly warning and error messages) contains detailed information about the cause of the error and how it can be removed.

  3. Changing Message Types

To change a message type, proceed as follows:

    1. Choose This graphic is explained in the accompanying text (or in certain logs, This graphic is explained in the accompanying text Error Management).
    2. The system display a list of user-definable messages whose type you can change.

    3. In the Message column, click on the message whose type is to be changed.
    4. The dialog box Allowed message types appears.

    5. Select the message type by double-clicking on it.
    6. The Message processed column in the list of user-definable messages shows the message type was changed.

      The graphical display in the Exception column is updated. For more information, see Structure link User-Defined Message Types and User-Defined Error Management in Cost Object Controlling.

    7. If you want to restore the default setting, choose This graphic is explained in the accompanying text.
    8. If you want to display all the user-definable messages, choose This graphic is explained in the accompanying text.
    9. To go back to the log, choose This graphic is explained in the accompanying text.
  1. Printing the Log
  2. To print the log that is currently displayed, choose This graphic is explained in the accompanying text. In certain logs, you can obtain a print preview by choosing This graphic is explained in the accompanying text.

    To print the logs generated by the costing run, choose Environment ® Costing Run ® Print Logs in the Product Cost Planning menu. For more information, see Structure link Printing the Log.

  3. Sending Messages

Note

The error management key in the costing variant determines whether you can send messages through Structure link message control.

The message is sent on the date that was specified in Customizing for Product Cost Planning (for example, when you save the cost estimate). For more information, see the Implementation Guide (IMG) for Product Cost Planning under ® Basic Settings for Material Costing ® Error Management ® Define Message Control.

To send messages, select the messages in the log and choose This graphic is explained in the accompanying text or Extras ® Send messages.

Note

Messages are normally only sent in Product Cost Planning via message control. If you want to use this function for sales order costing, order BOM costing or preliminary costing for product cost collectors, you must first of all change the setting in the costing variant and then make the necessary settings in Customizing for Product Cost Planning.

See also:

Leaving content frame