Entering content frameFunction documentation Quantity Structure Control Through the Initial Screen of the Cost Estimate Locate the document in its SAP Library structure

Use

For the highest material of the structure to be costed, you can determine which bill of material and routing are used through the initial screen of the material cost estimate with quantity structure.

Note

The entries in the initial screen take priority over the entries in the material master record and in the quantity structure control. For more information, see Quantity Structure Control Through Customizing and Quantity Structure Control Through the Material Master Record.

Note

If the BOM specified in the initial screen is contained in further multiple BOMs, for example, the system cannot explode the multiple BOMs.

Features

If you want to determine the data to be used for the header material in the initial screen of the cost estimate with quantity structure, enter the following:

or

Specifies whether the bill of material is, for example, an engineering BOM, a production BOM or a costing BOM.

Identifies a BOM within a multiple BOM. In view of the different manufacturing processes that exist, a material can, for example, be created for different lot size ranges through various alternative BOMs.

Groups routings for different lot size ranges or production processes. If you use different routing usages (such as production or repair), it is useful to create a new routing group for each usage.

Identifies routings within a task list group.

Note

Since the production version already contains information on the quantity structure, you enter either a production version or data pertaining to the BOM and routing. If you enter a production version and then make additional quantity structure entries, the production version takes priority. The quantity structure entries are ignored.