Entering content frameFunction documentation Integrated Activity-Based Costing Locate the document in its SAP Library structure

Use

Integrated Activity-Based Costing (ABC) fully integrates the Activity-Based Costing component (CO-OM-ABC) in the value flow of the Controlling component (CO), in particular the Product Cost Controlling component (CO-PC) and the Profitability Analysis component (CO-PA). Integrated ABC posts costs and quantities as real values, not statistical ones, to the participating objects.

Integrated ABC in Manufacturing Industries

This graphic is explained in the accompanying text

Note

Integrated ABC requires a radical rethinking of cost accounting as part of the overall managerial accounting strategy, with corresponding organizational restructuring requirements.

Activating an Integrated Activity-Based Costing

To activate integrated ABC in the Implementation Guide (IMG) for the Activity-Based Costing component, choose Controlling ® Overhead Controlling ® Activity-Based Costing ® Activating Activity-Based Costing in Controlling Area. Select a controlling area and choose Activate components/control indicators. Set the Activity-Based Costing indicator to "Component active for parallel and integrated calculation".

For the Activity-Based Costing component, this means:

You must activate integrated ABC for each separate controlling area.

See also:

Activity-Based Costing active in controlling area

 

 

 

Leaving content frame