Entering content frameProcedure documentationRevaluating Base Planning Objects Locate the document in its SAP Library structure

Use

If the master data changes, this data is not automatically updated in the base planning object. Therefore, instead of having to revaluate each base planning object individually, you can edit multiple base planning objects simultaneously.

Procedure

  1. Choose Accounting ® Controlling ® Product Cost Controlling ® Product Cost Planning ® Reference and Simulation Costing ® Revaluate Base Planning Objects.
  2. The screen Revaluate Base Planning Objects appears.

  3. Enter the name of the base planning objects whose costing items you want to revaluate.
  4. Enter the date on which the base planning objects are to be revaluated.
  5. If you want to add the base planning objects with errors to a work list, set the Generate worklist indicator. ( Editing Base Planning Objects in the Worklist)
  6. Choose This graphic is explained in the accompanying text.
  7. Note

    To execute this function in the background, choose Program ® Execute in background instead of This graphic is explained in the accompanying text. Check the background print parameters, and specify the start date and other start criteria (if applicable) for the background processing. Choose This graphic is explained in the accompanying text to save your entries and start the job (in the case of an immediate start of the background processing) or schedule it.

  8. Choose This graphic is explained in the accompanying text Log to call up the log and check the system messages.

Result

The system carries out multilevel revaluation of the base planning objects.

Example

Base planning object A contains base planning object B, and B contains base planning object C.

You specify that base planning object A is to be revaluated. The system revaluates C, B and A.

Leaving content frame