Prerequisites
Retrieve a reference scenario whenever you want to compare the figures in two different costing scenarios.
Procedure
The Choose Reference Plan screen appears.
Result
The costing figures from the selected reference scenario are shown in the Reference value column. The figures from the original scenario are shown is the Current amount column.