Prerequisites
Select a plan version to identify the plan you want to work with in Personnel Cost Planning.
The System defaults to the plan version designated as the active version in Customizing. You can, however, select a different plan version as described in the following procedure.
Procedure
The Plan Version dialog box appears.
Result
The selected plan version is set.