Entering content frameFunction documentationDeleting Planning Data Locate the document in its SAP Library structure

Use

Plan data that you no longer require (perhaps because you want to regenerate your planning according to other criteria) can be deleted. In so doing, you can either delete:

Note

Every user authorized to plan is also authorized to delete planning data, unless you specify otherwise in authorization management. For reasons of security, you should revise your authorization concept relating to planning data, entering authorizations for deleting planning data where necessary.

Features

When deleting planned costs, the R/3 System takes the following business transactions into account:

RKP1

Planning Primary Costs

RKP5

Planning Revenue Elements

RKP6

Activity-dependent planning Primary costs

RKP8

Planning Settlement Costs

RKP9

Activity-dependent planning order costs

RKPZ

Planning overhead credits

 

When deleting all planning data, the system also takes the following business transactions into account:

CPPP

ABC process assessment: Plan

KAZP

Plan Cost Center Accrual

KOAM

Plan internal activity allocation settlement

KOAP

Plan Settlement

RKP2

Planning Activities

RKP3

Plan Secondary Costs

RKP4

Planning statistical key figures

RKP7

Activity-dependent planning secondary costs

RKPB

Planned periodic reposting

RKPD

Transfer materials planning from PP

RKPK

Plan key figures with template

RKPL

Plan Indirect Activity Allocation

RKPP

Primary planning with template

RKPS

Plan secondary costs with template

RKPU

Plan Overhead Cost Assessment

RKPV

Plan Overhead Cost Distribution

RKPW

Secondary order cost planning

RKPX

Activity-dependent secondary order cost planning

KSP0

Plan splitting

KSP1

Primary plan splitting

KSP2

Secondary plan splitting

KSP3

ILV plan splitting

KZPP

Periodic plan overhead rates

See also:

 

 

 

 

 

 

 

Leaving content frame