Entering content frame target costs (CO-OM-CCA)

Cost Center Accounting (CO-OM-CCA)

The costs that are expected to arise in connection with the performance of a particular activity.

Target costs are calculated using the planned costs for the cost center and the planned costs for the activity to be performed. The target costs are then compared with the actual costs for the period.

Leaving content frame