Entering content frameFunction documentation Multi-Step Replenishment: Structured Articles Locate the document in its SAP Library structure

Use

Replenishment planning with multi-step replenishment allows you to calculate the requirements for a header article of a structured article based on the requirements for the relevant components. If you run replenishment planning with multi-step replenishment for the components and the components are not listed individually, the component requirements are converted into a header article requirement.

Integration

The following general function is used to calculate the header article requirements based on the component requirements: Structure linkRequirements Planning: Calculating the Header Article Quantities based on the Component Quantities.

Prerequisites

Example

If you want to maintain the master data for a prepack and run replenishment planning for components, you must follow the sequence listed below:

  1. Create a generic article (with variants)
  2. Maintain the suitable replenishment data that is to be copied later in the logistics data of the generic article at reference site level.

    Enter the availability indicator ND in the logistics data at reference site level so that replenishment planning is not carried out for that article.

  3. Create a bill of materials for a prepack, based on the generic article.
  4. List the prepack.

Here, the prepack components, in this case the generic article variants, are also listed. In accordance with the default logic of the article master, the replenishment master data is generated for the components in the listed sites.

Leaving content frame