Entering content frameFunction documentation Display of Materials to Be Costed Locate the document in its SAP Library structure

Use

You can call up this report to obtain a quick overview of the materials to be costed. The report is mainly used for the generation of extracts that can be displayed in a mini-application in the workplace.

Features

The report displays the following materials:

Activities

If you set the Sorted by Earliest Plan Order indicator in the selection screen, the dates of the orders for all materials to be costed for which a plan order exists (POrd) are sorted and displayed in the order start date column. If you don't set the indicator, performance during execution of the report is improved.

If you don't want to save the extract, you don't have to enter a user. If you save the extract without entering a user, all users can display the extract.

Under Maximum no. of hits, enter the maximum number of materials that should be displayed in the list. If you limit the number of hits, performance improves.

Integration

The extract that you save here is displayed in the mini-application. The report SAPRCKAPP02 allows you to see the contents of the extract in the R/3 system.

Note for System Administration:

To display the extract in the mini-application, you must carry out the steps described under Setting Up Mini-Applications.

 

Leaving content frame