Entering content frameFunction documentation Process: Value-Added Development Locate the document in its SAP Library structure

Use

You can assign business processes to Value Added Types (you define these categories in the Implementation Guide (IMG) of ABC; see Set Attributes). This report displays the development of the value added for the current and the two previous years.

The report classifies the business processes based on the type of value added. The system itemizes the allocated costs for the current and the two previous years, and grouped according to the value added types. The system also provides the cost sums for the applied value added type.

The report answers questions such as:

Features

Selection

The report is especially informative when you use it for a business process group.

On the selection screen you can determine which data the system should evaluate.

You can control the report contents through the output parameter.

You can produce extracts from this report.

Note

For more information on working with Report-Painter reports (selecting, generating extracts, setting output parameter, and more) see Execute the Report-Painter Report.

Output

The report has the following row and column structure:

Report rows and columns:

The system provides a row of summed costs for each value-added type for the current and previous two years.

The last row contains totals for each column.

The first section shows the data from internal value added; the second shows the external value added.

Report/Report-Interface

You can branch out to the following reports through the Report/Report-Interface :

 

Leaving content frame