Entering content frameBackground documentation Errors During Multilevel Price Determination Locate the document in its SAP Library structure

Prerequisites

In order to perform multilevel price determination successfully, the following prerequisites must be satisfied:

Errors During Material Price Determination

Even if these prerequisites have been met, you may still experience the following errors during multilevel price determination:

  1. The cumulated quantity of a material in the period is zero, which prevents an actual price from being calculated.
  2. The actual BOM contains a cycle that is not converged and therefore does not allow price determination.
  3. The price for the material is negative.
  4. The price calculated in multilevel price determination for a material exceeds the threshold you set.
  5. The sum of the multilevel price differences that would subsequently be debited to the material exceeds the threshold you set.

These errors can be divided into three categories:

Options for Error Correction

See also:

Automatic Error Correction by the System

Processing Incorrect Material Price Determination Manually

Control of Automatic Error Correction (Postprocessing Options)

 

 