Entering content frameFunction documentation Template Allocation in Plan Locate the document in its SAP Library structure

Use

The use of template allocations is one method to assign overhead costs. This method is unique for several reasons:

In order to describe the allocation quantities in plan, you create modeled assumptions allowing best estimates of expected quantities based on the given (static) master data.

Example 

For example, the number of purchase orders per sales orders serves as the process driver of the procurement process for a sales order processor. In order to estimate the plan quantities of expected procurements for this order, the SAP System uses the relevant template function to dynamically determine the number of different components not in stock based on the bill of materials for the product to be produced.

Prerequisites

These include:

Features

Enter the receiver object(s) in the entry screen for template allocation to determine the overhead costs. When you carry out the allocation, the system does the following:

The result is a list of receiver and sender objects of the activity quantities and relevant costs (quantity*price).

Activities

You have completed all prerequisites.

To carry out a template-allocation:

See also:

Structure link Template Allocation in Actual

Leaving content frame