Entering content frameProcedure documentation Activating Line Items and Integrated Planning Locate the document in its SAP Library structure

Procedure

You can set Integrated planning either:

a) To do this, call up the Implementation Guide (IMG) for Controlling, under Overhead Cost Controlling ® Cost Center Accounting ® Planning ® Basic Settings ® Maintain Versions or Controlling ® Activity-Based Costing ® Planning ® Maintain Versions

b) Select Integrated planning under Settings for fiscal year.

Caution

You can select or deselect Integrated planning in version maintenance only if no plan data exists in the R/3 System.

If plan data exists, you can select Integrated planning in the Cost Center Accounting initial screen as follows:

Choose Accounting ® Controlling ® Cost centers ® Planning ® Planning aids ® Activate integration.

This function ensures that.

Caution

You can only deactivate Integrated planning if no plan data exists.

Note

· To avoid system performance problems, select Background processing.

· If the integrated planning run is terminated by the R/3 System, you can continue the integration in a second run. Note, however, that the corresponding plan version remains locked until integration has been completed.

· Select Test run if you do not want to update the results immediately.

 

 

 

 

 