Plant Maintenance (PM)
   Replacing a Pump in an Operational System
      Data Used During This Process
      Selecting the Equipment Master
      Displaying the Equipment Attributes of a Pump
      Displaying the Pump Structure List
      Displaying the Hierarchical Structure of the Technical System
      Removing the Defective Pump
      Changing the Attributes of the Dismantled Equipment
      Installing the Intact Pump
      Changing the Attributes of the Installed Equipment
      Graphically Displaying the Supply Network
      Replacing the Pump in the Supply Network
      Analyzing the Equipment Usage History
   Managing a Serialized Replacement Part
      Data for This Example
      Creating the Purchase Order With a Reference PO
      Creating the Goods Receipt for Material Assigned a Serial Number
      Creating Serial Numbers Automatically at Goods Receipt
      Displaying the Material Document With Serial Numbers
      Changing the Equipment Master Records
      Entering the Malfunction Report
      Creating a Maintenance Order From the Malfunction Report
      Setting a Maintenance Order to “In Process”
      Goods Issue for a Pump With Serial Number
      Removing the Defective Pump
      Installing the New Pump
      Documenting the Cause of Damage and Action Taken
      Entering the Final Confirmation for the Order
      Settling the Maintenance Order
      Closing the Maintenance Order
   Displaying the Structure of a Complex Technical Asset
      Data for this Example
      Graphical Display of the Structure
   Alternative Labels for Functional Locations
      Data for This Example
      Defining the Labeling System for a Functional Location
      Creating a User Profile
      Creating an Alternative Label for a Functional Location
      Creating the Order
      Displaying the Order
   Entering the Measurement Reading
      Data for This Example
      Displaying the Measuring Points
      Entering the Measurement Reading
      Executing the Measuring Point Analysis
      Sending a Graphic
      Displaying the Graphic
   Entering Measurement Values Using the Measurement Reading Entry
      Data for this Example
      Creating a Measurement Reading Entry List
      Entering the Measurement Reading
   Creating and Scheduling Time-Dependent Maintenance Plans
      Data for this Example
      Creating the Maintenance Plan
      Assigning the Task List
      Scheduling the Maintenance Plan
      Displaying the Maintenance Order
      Processing the Maintenance Order
      Displaying the Actual Variance of the Planned Date
      Monitoring and Scheduling the Follow-Up Dates
      Displaying Postponements to the Follow-Up Dates
   External Processing of Preventive Maintenance Measures
      Additional Information for this Example
      Data for This Example
      Creating the Maintenance Plan
      Assigning and Displaying the Task List
      Maintaining Scheduling Parameters and Saving Maintenance Plan
      Scheduling the Maintenance Plan
      Displaying the Maintenance Order
      Displaying the Purchase Requisition
      Releasing the Maintenance Order
      Assigning a Vendor to the Purchase Requisition
      Creating a Purchase Order
      Entering Externally Provided Services
      Approving and Releasing the Service Entry Sheet
      Logistics Invoice Verification
      Displaying the Purchase Order
      Settling the Maintenance Order
      Closing the Maintenance Order
      Displaying Scheduled Maintenance Calls (Optional)
      Monitoring and Scheduling the Follow-up Dates
      Displaying Postponement of Planned Dates (Optional)
   Maintenance Plan for Calibrating Measurement Instruments
      Data for This Example
      Creating the Maintenance Plan
      Assigning and Displaying the Task List
      Scheduling the Maintenance Plan
      Displaying the Calibration Order and the Inspection Lot
      Entering Characteristic Values
      Entering the Usage Decision
      Confirming the Order
      Displaying Order Status
      Settling the Order
      Closing the Order
   Performance-based Completion Confirmations from Production
      Data for This Example
      Maintenance Plan – Scheduling Display
      Creating a Production Order
      Confirming the Production Order
      Displaying the Measurement Document
      Monitoring Deadlines for the Maintenance Plan
      Displaying Maintenance Plan Scheduling
      Changing the Order
      Assigning Materials in the Maintenance Order
      Releasing the Maintenance Order and Printing Shop Papers
      Issuing Materials (Optional)
      Displaying the Withdrawal Quantity
      Time Confirmation
      Technically Completing the Order
      Settling the Order
      Closing the Order
   Performing Quick Repairs Without Comprehensive Resource Planning
      Data for This Example
      Creating a Damage Report
      Opening the Order From the Malfunction Report and SOP
      Releasing the Order and Printing Papers
      Overall Completion Confirmation for the Order
      Analyzing the Total Costs and Technically Completing the Order
      Settling the Order
      Analyzing Costs and Closing the Order
      Displaying Order History for Equipment
   Performing a Task with Comprehensive Resource Planning
      Data for This Example
      Entering the Malfunction Report
      Selecting the Malfunction Report from the Worklist
      Creating an Order and Selecting the Maintenance Task List
      Scheduling the Order
      Checking the Capacity of the Work Center
      Checking Material Availability of the Assigned Components
      Planning the Required Production Resources and Tools
      Releasing the Order
      Analyzing the Planned Costs
      Withdrawing the Material
      Displaying the Withdrawal Quantity on the Order
      Entering the Time Confirmation
      Creating the Technical Confirmation Report
      Analyzing the Total Costs and Technically Completing the Order
      Settling the Order
      Closing the Order
   Scheduling Individual Capacity Using the Graphical Planner Table
      Data for This Example
      Creating the Task List
      Assigning Qualifications and Releasing the Task List
      Creating a Maintenance Order and Assigning it to the Task List
      Scheduling Order Operations Using a Hit List
      Using a Time Sheet to Enter Work Times
      Creating a Confirmation for the Order
      Technically Completing the Order
   Recording Findings and Processing Repair With Additions to Order
      Data for This Example
      Creating a Maintenance Order for the Investigation
      Using the Structure List to Assign a Reference Object
      Putting an Order in Process and Printing Shop Papers
      Creating a Damage Entry in the Order for the Affected Equipment
      Changing the Order to Carry Out Repairs
      Assigning Materials from the Bill of Materials
      Adding Activities and System Availability to Malfunction Report
      Printing Shop Papers for Additions to an Order
      Issuing Materials
      Checking the Material Withdrawal Quantity in the Order
      Confirming the Order
      Technical Confirmation Report / Technically Completing the Order
      Settling the Order
      Closing the Order
   Processing Material Refurbishment Without Serial Numbers
      Data for This Example
      Displaying the Material Master
      Creating a Refurbishment Order
      Setting an Order to “In Process”
      Material Withdrawal for the Refurbishment
      Time Confirmation
      Goods Receipt of the Refurbished Material
      Check Material Stock
      Displaying Material
      Technically Completing the Order
      Settling the Order
      Closing the Order
   Simplified External Assignment of Maintenance Tasks
      Data for This Example
      Creating the Order
      Assigning the Task List
      Releasing the Order
      Displaying the Purchase Requisition
      Procuring External Services
      Confirming the External Service
      Analyzing Total Costs and Technically Closing the Order
   Performing a Repair Task Externally
      Additional Information for this Example
      Data for this Example
      Creating a Maintenance Order Directly from the Malfunction Repor
      Considering unplanned Services
      Releasing the Order
      Processing the Purchase Requisition
      Entering Performed Services
      Entering the Technical Report
      Releasing and Accepting Service Entry Sheets
      Logistics Invoice Verification
      Analyzing Total Costs
      Settling the order
      Closing the Order
   Using Service Packages for Internal Services
      Additional Information for this Example
      Data Used During This Process
      Creating the Order
      Assigning Services
      Releasing the Order
      Confirming the Order
      Settling the Order
      Closing the Order
   Work Clearance Management
      Data for This Example
      Creating a Malfunction Report
      Creating the Order
      Creating a Work Clearance Application for an Order
      Creating an Operational WCD for a Work Clearance Application
      Preparing Work Clearance Objects
      Approving Lockout/Tagout
      Performing Lockout/Tagout
      Issuing the Status Released for Execution
      Issuing the Status Work Complete
      Completing the Work Clearance Application
      Carrying Out Untagging
   Recording Measurement Readings and Counter Readings via Internet
      Additional Information for this Example
      Data for this Example
      Recording Measurement Readings and Counter Readings via Internet
      Displaying Measurement Documents
   Configurable Interface for Processing Notifications
      Data for This Example
      Creating a New Notification Type
      Setting Screen Templates for the Notification Type
      Assigning the Number Range for the New Notification Type
      Assigning the Priority Type
      Creating the Notification