Customer Service (CS)
   Management of the Installed Base
      Serviceable Item as a Material
      Serviceable Item as a Piece of Equipment
      Serviceable Item as a Functional Location
      Serviceable Item as a Bill of Material
   Installed Base Management (CS-IB)
      Installed Base
      Creating an Installed Base
         Creating an Installed Base with a Reference
         Creating an Installed Base from Sales Data
         Creating an Installed Base from Production Data
      Displaying an Installed Base
         Displaying an Installed Base from the Technical Object
         Displaying an Installed Base from the Notification
      Structure Processing of an Installed Base
      Environment Display for the Installation
   Technical Objects (CS-BD/PM-EQM)
      Functional Locations (CS-BD/PM-EQM-FL)
         Functional Location
         Reference Functional Location
            Creating a Reference Functional Location
            Copying a Reference Functional Location
            Changing and Displaying a Reference Functional Location
            Activating/Deactivating Reference Functional Locat
            Flagging a Reference Functional Location for Delet
         Structure Indicator
         Creation Functions for Functional Locations
            Creating a Functional Location
            Creating a Functional Location for the Reference Location
            Creating a Functional Location Using a Copy Reference
            Assigning a Superior Functional Location
         Changing and Displaying a Functional Location
         Renaming Functional Locations
         Changing the Maintenance Plant in a Functional Loc
         Activating/Deactivating Functional Locations
         Flagging a Functional Location for Deletion
         Alternative Labeling Systems
            Configuring a Required Labeling System
            Assigning an Alternative Label to a Functional Loc
            Displaying Alternative Labels for a Functional Loc
         Representing the Structure of a Whole System
            Displaying Location Structures
         List Editing for Functional and Reference Function
            Creating Location Master Records Using List Editin
            Creating Similar Structures
            List Editing Using a Copy Reference
            Replacing Location Labels
            List Editing Using a Reference Functional Location
         Consistency Check for Functional Location Data
            Performing a Consistency Check
      Equipment (CS-BD/PM-EQM-FL)
         Equipment
         Creating a Piece of Equipment
         Using List Editing for Equipment
         Changing a Piece of Equipment
         Changing the Maintenance Plant
         Change View Selection
         Displaying an Equipment Master Record
         Activating/Deactivating Equipment
         Flagging a Piece of Equipment for Deletion
         Displaying Usage Times
         Displaying the Structure List and the Structure Gr
         Equipment at Functional Locations
            Installing/Dismantling Equipment from the Function
               Installing Equipment
               Dismantling Equipment
               Replacing Equipment
            Installing/Dismantling from the Equipment Master R
               Installing Equipment
               Dismantling Equipment
               Replacing Equipment
         Hierarchical Equipment Structure
            Hierarchy System for Equipment
               Installing Sub-Equipment in a Piece of Equipment
               Installing Equipment in a Superior Piece of Equipment
            Changing the Equipment Hierarchy
               Changing the Hierarchy in the Superior Equipment Master Record
                  Installing Further Sub-Equipment
                  Deleting Pieces of Sub-Equipment
                  Replacing Sub-Equipment
                  Changing the Position Number
               Changing the Hierarchy in the Sub-Equipment Master
            Hierarchy Display for Equipment
               Displaying the Whole Hierarchy
               Displaying the Sub-Equipment Structure of an Indiv
         Production Resources/Tools as Equipment
            Creating Production Resources/Tools as Equipment
            Creating PRT Usage Counters for Equipment
            Releasing/Locking Production Resources/Tools
         Fleet Object as Equipment
            Fleet Management
               Creating a Fleet Object as Equipment
         Equipment as Units of Tangible Assets
            Allocating Equipment to an Asset
         Configuration Data
            Configuring a Piece of Equipment as a Variant
            Copying and Changing an Existing Configuration
            Creating a New Configuration
      Comparison: Equipment - Functional Location
      Functions of Technical Objects
         Data Transfer
            Hierarchical Data Transfer
            Horizontal Data Transfer
            Data Transfer By System Rules
            Individually-Defined Data Transfer
            Data Transfer Sequence
            Transferring Data from Dependent Fields
            Transferring Data When Objects are Locked
               Processing the Objects Immediately
               Processing the Objects Later
            Data Transfer for Subsequent Structure Changes
            Data Transfer
               Transferring Data From the Superior Equipment or L
               Transferring Data From Installed Equipment
         Displaying and Changing Data Origin
            Displaying and Changing Data for Locations
               Displaying Data Origin for Locations
               Changing Data Origin for Locations
            Displaying and Changing Data Origin for Equipment
               Displaying Data Origin for Pieces of Equipment
         Classification of Technical Objects
            Creating and Changing Characteristics and Classes
            Classifying Reference Functional Locations
            Classifying Functional Locations
            Classifying Equipment
            Changing the Classification
         Document Management for Technical Objects
            Linking Master Records to Documents
            Displaying Documents
         Creating Multilingual Texts for Technical Objects
            Entering Multilingual Short Texts
            Entering Multilingual Long Texts
         Administrative Information for Technical Objects
            Displaying Administrative Information
            Displaying the Action Log
         Object Information
            Calling up Object Information
         Permit
            Creating Data for the Permit
            Assigning a Permit
         Partner
            Customizing for Partners
            Partner Transfer
            Creating a Partner for the Technical Object
         Status Management
            System Status
            User Status
            Displaying the Status and Transactions Allowed
            Setting a User Status
            Deactivating a User Status
         Flagging Master Records for Deletion
         Deactivating Master Records
      Management of Technical Objects
         Comparison: Structural Display – Product Structure Browser
            Defining a Display Filter
            Creating a Structure
            Processing a Structure
            Showing Environment Data
            Hiding Object Dependencies
            Managing Structural Changes
            Information About Structural Changes
   Measuring Points and Counters (CS-IB-MC/PM-EQM-SF-MPC)
      Measuring Point
      Counter
      Measurement Document
      Counter-Based Maintenance
      Condition-Based Maintenance
         Customer Exit IMRC0001
            Calling up Documentation for the Exit
      Entering Measurement and Counter Readings
         Entering Measurement and Counter Readings in the I
         Entering Measurement and Counter Readings as Barcodes
      Basic Functions
         Creating Measuring Points and Counters
            Creating Measuring Points When Processing a Technical Object
            Creating a Measuring Point Directly
            Creating Counters When Processing a Technical Object
            Creating a Counter Directly
            Classifying a Measuring Point/Counter
            Defining a Measurement Range
         Processing Measuring Points and Counters
         Creating Measurement Documents
         Processing Measurement Documents
            Example for Reversing a Measurement Document
      Additional Functions
         Transfer of Measurement and Counter Readings
            Defining Data for a Measurement/Counter Reading Transfer
            Repeating a Measurement or Counter Reading Transfer
            Defining a Measurement/Counter Reading Transfer for Copied Locat
            Displaying the Transfer Hierarchy for a Key Date
         Working With a Measurement Reading Entry List
         Setting the Total Counter Reading Externally
         Representing Counter Replacement
         Converting Units of Measurement
            Using the Conversion Function
   Permits (CS-SE/PM-EQM-SF)
      Working with Permits
      Creating, Changing and Deleting a Permit as Master Data
      Assignment of Permits
         Assigning Permits
         Displaying a Permit List
         Changing an Assignment of Permits
         Canceling an Assignment of Permits
      Entering, Issuing and Canceling a Permit
   SAP Business Partner (SAP BP)
      Business Partner Category
      Creating Business Partners
      Changing/Displaying Business Partners
      Business Partner Role (BP Role)
         BP Role Contact Person
         BP Role Prospect
         BP Role Business Partner, General
         GP-Rolle Mitarbeiter
         GP-Rolle Organisationseinheit
      BP Role Grouping
      SAP Business Partner Data
         Addresses
            Creating Other Addresses
            Assigning Address Usage
         Bank Details
         Payment Cards
      Business Partner Relationship (BP Relationship)
         Creating Relationships (Integrated Maintenance)
         Creating Relationships (Independent Maintenance)
         Changing Relationships (Integrated Maintenance)
         Changing Relationships (Independent Maintenance)
      Relationship Category
         Relationship Category “Is Contact Person For”
         Relationship Category “Is Married To”
         Relationship Category “Is Activity Partner For”
         Rel. Cat. “Belongs To A Shared Living Arrangement”
         Relationship Category "Is Identical To"
         Relationship Category "Is Shareholder Of"
      Central Relationship Data
      Extensibility
      Data Transfer
         External Data Transfer
   Task Lists (CS-AG/PM-PRM-TL)
      Maintenance Task Lists
         Task List Group
         Equipment Task List
         Task List for Functional Location
         General Maintenance Task List
         Operation
         Sub-Operations
         Internally Processed Operations
         External Processing Operations
         Control Key
      Maintenance Task Lists for Planned Maintenance
      Number Assignment for Maintenance Task Lists
      Copying Data in Technical Objects
      Creation of a Profile
      Determination of Validity
      Creation of a Maintenance Task List
         Creating Maintenance Task Lists
         Entering Header Data
         Creating a Maintenance Task List Using a Reference
         Creating an Operation
            Entering Detail Data in Operations
            Including User Data in Operations/Sub-Operations
            Creating Ext. Ops. With Service Specification Ref.
            Assigning Maintenance Packages
         Creating a Sub-Operation
            Entering Dates in Sub-Operations
            Including Detail Data in Sub-Operations
            Including User Data in Operations/Sub-Operations
      Documentation of Changes
         Reasons for Documenting Changes
         Changing Maintenance Task Lists
         Displaying the Change Master Record
         Displaying Change Documents
      Processing Maintenance Task Lists
         Printing Maintenance Task Lists
         Changing Maintenance Task Lists
         Assigning Maintenance Packages
      Deletion of Maintenance Task Lists
         Deleting at Maintenance Task List Level
         Setting a Deletion Flag in the Task List Header
      Operation
         Creating an Operation
         Subsequently Entering Operations
         Entering Detail Data in Operations
         Entering QM Data for the Operation
         Including User Data in Operations/Sub-Operations
         Creating Ext. Ops. With Service Specification Ref.
         Deleting Operations/Sub-Operations
         Internal Service Packages for the Operation
      Sub-Operations
         Features of the Sub-Operation
         Creating a Sub-Operation
         Entering Dates in Sub-Operations
         Including Detail Data in Sub-Operations
         Including User Data in Operations/Sub-Operations
         Deleting Operations/Sub-Operations
      Material Components
         Assignment of Material Components
            Assigning Material Components
            Sorting Material Components
            Working With the Structure Graphic
         Displaying Material Where-Used Lists
      Production Resources/Tools
         Creating Material for Production Resources/Tools
         Creating Production Resources/Tools (Other)
         Creating Documents for Production Resources/Tools
         Creating Equipment Production Resources/Tools
         Creating PRTs Using a Reference
         Changing Production Resources/Tools
         Displaying Production Resources/Tools
         Assigning Production Resources/Tools to Operations
         Deleting the Production Resources/Tools Assignment
         Deleting Production Resources/Tools
            Assigning a Deletion Flag to “Material” PRTs
            Deleting Production Resources/Tools (Other)
            Assigning Deletion Flag to “Other“ / “Docu.“ PRTs
            Assigning a Deletion Flag or PRTs “Equipment“
      Bulk Functions for Work Centers and PRTs
         Pre-Setting Overview Variants
         Creating Where-Used Lists for PRTs
         Replacing Production Resources/Tools
         Replacing Work Centers
         Creating Where-Used Lists for Work Centers
      Relationships
         Time Intervals in Relationships
         Prerequisites for Creating Relationships
         Creating Relationships
            Creating a Relationship in the Graphic
            Creating a Relationship in the List
         Creating an Operation in the Graphic
         Changing Relationships
         Displaying Relationships
         Deleting Relationships
         Loop Analysis
      Cost Analysis
         Analyzing Costs
         Creating a Log for Cost Analysis
      Configurable General Maintenance Task Lists
         Configuration Profile
         Creation of Configurable General Maintenance Task Lists
            Creating Configurable General Maintenance Task Lists
            Creating Config. Profile for Gen. Maint. Task List
         Service Packages in Configurable General Maintenance Task Lists
   Maintenance Planning (CS-AG/PM-PRM-MP)
      Maintenance Plan
         Single Cycle Plan and Strategy Plan
         Multiple Counter Plan
         Maint. Plan with Reference to an Outline Agreement
         Maintenance Plan for Service Procurement
         Maintenance Plan and Sales Document Item
         Example 1: Maintenance Plan
         Example 3: Maintenance Plan
         Example 2: Maintenance Plan
      Process for Maintenance Planning
      Maintenance Plan Type
         Time-Based Maintenance Plan
         Performance-Based Maintenance Plan
      Maintenance Plan Category
         Maintenance Call Object
      Practical Functions and Utilities
         Optimizing the Maintenance Plan
         Worklist for Planned Maintenance
         Configurable Equipment as a Reference Object
         Defining a Default Value for a Maintenance Plan Ca
         Sort Field for the Maintenance Plan
         Priority for Maintenance Item
         Automatic Task Determination for Notifications
         Profile for a General Maintenance Task List
            Creating a Profile for a Maintenance Task List and
         Cycle Set
            Creating a Cycle Set
      Creating a Maintenance Plan
         Creating a Single Cycle Plan
         Creating a Time-Based Strategy Plan
         Creating a Performance-Based Strategy Plan
         Creating a Multiple Counter Plan
         Creating a Maint. Plan for Service Procurement
         Creating a Maint. Plan for an Outline Agreement
      Processing Maintenance Plans
         Setting a Deletion Flag for Several Maint. Plans
         Creating a Maintenance Item in the Maint. Plan
      Maintenance Cycle and Maintenance Package
         Creating/Changing Maint. Cycles in MultCntr Plans
      Maintenance Item
         Creating a Maintenance Item in the Maint. Plan
         Creating a Maintenance Item Without Assignment
         Assigning a Maintenance Item to a Maintenance Plan
         Processing a Maintenance Item
         Changing a Reference Object of a Maintenance Item
         Object List
            Rules for Processing an Object List
            Processing an Object List
         Assignment of Task Lists to a Maintenance Item
            Assigning a Functional Location Task List or Equip
            Creating a Task List from the Maintenance Item
            Assigning a General Maintenance Task List
               Choosing a General Maintenance Task List Using an
               Choosing a General Maintenance Task List Using an
               Choosing a General Maintenance Task List Using Gen
      Maintenance Task Lists
         Creating a Task List from the Maintenance Item
         Assignment of Task Lists to a Maintenance Item
            Assigning a Functional Location Task List or Equip
            Assigning a General Maintenance Task List
               Choosing a General Maintenance Task List Using an
               Choosing a General Maintenance Task List Using an
               Choosing a General Maintenance Task List Using Gen
         Profile for a General Maintenance Task List
            Creating a Profile for a Maintenance Task List and
      Maintenance Strategy
         Creating a Maintenance Strategy
         Changing a Maintenance Strategy
            Adding Maintenance Packages
            Copying Maintenance Packages
            Reactivating Processed Maintenance Packages
         Deleting a Maintenance Strategy
            Reactivating a Deleted Maintenance Strategy
         Displaying Package Sequence: Maint. Strategy
         Displaying Uses for a Maintenance Strategy
      Scheduling
         Scheduling a Maintenance Plan Automatically
         Rescheduling
         Completion Confirmation
         Scheduling Parameters
            Changing the Scheduling Parameters
            Scheduling Indicators
               Time-Based Scheduling
               Scheduling Based on a Key Date
               Scheduling by Factory Calendar
               Performance-Based Scheduling
            Shift Factor
            Tolerance
            Cycle Modification Factor
            Call Horizon
            Scheduling Period
            Confirmation Requirement
            Preliminary Buffer
            Follow-up Buffer
            Link Type
            Maintenance Package Hierarchy
            Example Customer Exit IPRM0005
            Example Customer Exit IPRM0002 (1)
            Example Customer Exit IPRM0002 (2)
            Example Customer Exit IPRM0002 (3)
            Example Function Module MEASUREM_POINT_UPD_PYEAR
         Special Scheduling Functions
            First-Time Scheduling
               Scheduling a Time-Based Maintenance Plan for the F
               Scheduling a Performance-Based Maintenance Plan fo
               Scheduling a Multiple Counter Plan for the First T
            Confirming a Maintenance Call
            Rescheduling a Maintenance Plan
            Canceling Scheduling
            Restarting Scheduling
            Starting Scheduling in the Current Cycle
            Creating a Maintenance Call Manually
            Changing the Status of a Call
            Adapting a Planned Date Individually
         Displaying Maintenance Call Objects
            Displaying Orders or Notifications
            Displaying a Service Entry Sheet
            Displaying Objects for an Outline Agreement
      Scheduling Overview
         Calling Up a Call History
            Changing the Status of a Call
            Displaying a Scheduling Algorithm for a Maintenanc
         Displaying a Scheduling List
         Displaying a Scheduling Overview from the Maintena
         Displaying a Scheduling Overview Using List Editin
         Displaying the Graphical Scheduling Overview or Si
            Variant Maintenance for Scheduling Overview
            Working with the Graphical Scheduling Overview
            Simulating Changes in the Scheduling Overview
            Shifting a Call Date in the Scheduling Overview
            Changing a Call in the Scheduling Overview
      Maintenance Plan Costing
         Costing Maintenance Plans
         Example of Maintenance Plan Costing
      Status Management
         Displaying Status Information
      Document Flow
         Document Selection
         Displaying Document Flow for Notifications or Orders
         Obtaining Maintenance Contract Information from the Document Flo
   Service Agreements
      Service Contract
      Quantity Contract
      Partner
         Customizing for Partners
         Partner Transfer
         Copying the Partner into the Serial Number
         Creating a Partner for the Technical Object
         Creating a Partner for the Notification
         Creating a Partner for the Order
   Warranties (CS-AG-WA/PM-EQM-SF)
      Warranty
      Master Warranty
      Defining a Warranty Counter
      Creating a Master Warranty
      Warranty Management
      Warranty Check
   Sales Pricing and Quotation Creation
      Quotation Creation Process (CS)
         Quotation Creation (CS)
         Quotation Creation Scenarios (CS)
            Quotation Creation in Customer Service - Scenario 1 (CS)
            Quotation Creation in Customer Service - Scenario 2 (CS)
         Creating a Quotation (CS)
         Processing a Quotation (CS)
         Accepting a Quotation (CS)
      Sales Pricing in the Project System
         Sales Pricing for Customer Inquiries Assigned to Projects
            Creating Quotations for Customer Projects (PS)
         Sales Pricing in the Project Builder
         Selection Criteria (PS)
         Recording Planned Revenues (PS)
      Processing the Sales Price Basis
      Processing the Sales Price View
      Settings: Sales Pricing and Billing
      Sales Pricing Options
   CS - Customer Interaction
      Customer Interaction Center
         Front Office
            CIC Profile
            Front Office Framework
            Front Office Framework Visible Components
               Call State View
               Contact Search and Display
                  Identifying a Contact Manually
                  Finding a Contact
                  Displaying a Contact
                  Creating a Contact
                  Cancelling a Search
                  Displaying More Information
                  Creating a New Contact Person
                  Clearing the Fields
               Scripting
               Action Box
                  Action Box Usage
               Solution Search
               Application Area
                  CIC-Enabled HTML Pages
               Business Data Display
                  Displaying a Business Object
                  Changing a Business Object
                  Finding a Business Object
               Quick Keys
               Component Container
            Front Office Framework Hidden Components
               Toolbar
               Callback Queues
                  Creating a Callback
                  Processing a Callback
                  How R/3 Assigns Status to Callbacks
               CTI
                  Selecting a Queue
               Call Center
               Logging
               Hidden Action Box
               Hidden Script
            Front Office Administration
               Agent Administration
                  Working with an Organizational Structure
               Agent Settings for SAPphone
                  Agent Initialization
                  Setting your Work Center Telephone Number
               CTI Queue Definition
                  Defining CTI Queues
               DNIS Mapping
                  Entering a DNIS Translation
               Scripting Administration
                  Maintaining Script Texts
                  Creating Script Variables
                  Assigning Scripts to Profiles
               Archiving
         Telephony Controls and Work Modes
         CTI Interfaces
   Notifications (CS-CM-SN/PM-WOC-MN)
      Maintenance Notifications (PM-WOC-MN)
         Maintenance Notification
            Malfunction Report
            Maintenance Request
            Activity Report
            User-Specific Notification Types
      Maintenance Processing for Unplanned Tasks
      Service Notifications (CS-CM-SN)
         Service Notification
            Customer Notification
            Activity Report
            Service Request
            User-Specific Notification Types
         Special Functions in the Service Notification
            Entry of Partner Data in a Service Notification
            Transfer of One-Time Customer Data
            Credit Limit Check
            Incoming Calls
            Outgoing Calls
            Task Determination and Notification Monitoring
               Parameters for Task Determination
               Automatic Determination of Tasks
               Example: Automatic Determination of Tasks
               Notification Monitoring
               Monitoring of Response Time
         Service Notifications in the Internet (CS-CM-SN)
            Process Flow (Service Notifications)
               Application Example (Service Notifications)
      Creating, Changing and Displaying a Notification
         Configuration of User Default Values
         Entering a Notification Header Text
         Entering Items
         Data from the Copy Model
         Cause
            Entering Causes for an Item
         Processing Different Notification Data
         Entering Breakdown Data and Duration
         Specifying a Priority
         Entering Measurement Documents
         Linking a Document From the DMS
         Displaying the Action Log for a Notification
         Displaying Changes in Notifications
         Displaying an Installed Base from the Notification
      Partner
         Customizing for Partners
         Partner Transfer
         Creating a Partner for the Notification
         Calling Up Partner Information
      Reference Object
         Specifying and Changing Reference Objects
         Calling up Object Information
         Time Zones
      Task
         Entering Tasks
         Status Management for Tasks
         Automatic Determination of Tasks
            Example: Automatic Determination of Tasks
         Follow-Up Actions for Tasks
      Activity
         Entering Activities
      Catalog Profile
         Copying Another Catalog Profile
         Changing the Catalog Profile
      Action Box
         Standard Follow-Up Functions (Activities)
         Standard Follow-Up Functions (Tasks)
      Shop Papers
         Printing and Faxing of Shop Papers
            Printing a Maintenance Notification in Full
            Printing a Notification Item
            Printing/Faxing Shop Papers for Several Notifications
            Faxing Shop Papers
            Viewing the Print Log
            Archiving Shop Papers in ArchiveLink
            Downloading a Notification
      Sending of Short Messages Using Paging
         Sending of Messages Using the Internet and SAPoffice®
         Use of Standard Texts
      Putting Notifications in Process
      Assignment of Notifications to Orders
         Worklist for Planned Maintenance
         Creating an Order from a Notification in the Background
         Creating an Order Directly from a Notification
         Assigning an Order to a Notification
         Assigning a Notification to an Order
         Creating a Notification for the Order
         Deleting an Assignment Between Notification and Order
      Postponement of Notifications
      Notification Completion
         Notification History
         Completing a Notification Directly
         Completing the Maintenance Notification from the Order
         Putting a Notification in Process Again
         Entering Technical Findings
      Deletion of Notifications
      Selection of Notifications
         Execution of Functions for Several Notifications
         Creating an Order for Several Notifications
         Selecting Items, Tasks and Activities
            Displaying the Portfolio
            Calling up Graphics
      Document Flow
         Displaying Document Flow for Notifications or Orders
         Document Selection
         Obtaining Maintenance Contract Information from the Document Flo
      Evaluation of Notifications
      Status Management in Notifications
         Displaying a Status
         Assigning System Statuses Automatically
         Setting/Resetting User Status
      Entering Responsibilities (Workflow Connection)
   Solution Database
      Symptom
         Symptom Definition
            Maintaining Descriptions in Multiple Languages
            Defining a Problem Location
            Defining a Problem Damage
            Defining a Problem Cause
            Creating a Link to a Business Object
      Solution
         Solution Definition
            Maintaining Descriptions in Multiple Languages
            Assigning a Task
            Creating an Attachment
         Creating Links Between Symptoms and Solutions
         Setting Focus in Navigation Tree
         Solution Database Search
         Step-by-Step Guide (Wizard)
         User Settings
   Call Management
      Processing of Services
         Service Processing Using a Service Notification
         Service Processing Using a Service Order
         Service Processing Using a Sales Order
      Sales Pricing and Quotation Creation
         Quotation Creation Process (CS)
            Quotation Creation (CS)
            Quotation Creation Scenarios (CS)
               Quotation Creation in Customer Service - Scenario 1 (CS)
               Quotation Creation in Customer Service - Scenario 2 (CS)
            Creating a Quotation (CS)
            Processing a Quotation (CS)
            Accepting a Quotation (CS)
         Sales Pricing in the Project System
            Sales Pricing for Customer Inquiries Assigned to Projects
               Creating Quotations for Customer Projects (PS)
            Sales Pricing in the Project Builder
            Selection Criteria (PS)
            Recording Planned Revenues (PS)
         Processing the Sales Price Basis
         Processing the Sales Price View
         Settings: Sales Pricing and Billing
         Sales Pricing Options
      Returns and Repairs Processing (CS)
         Repair Order
            Serviceable Material
            Service Product
            Actions for Managing Repairs Processing
               Repair Procedure
            Material Determination in the Repair Order
            Statuses in the Repair Order
         Serial Number Handling in Repairs Processing
         Worklists in Repairs Processing
         Pricing and Billing the Repair Order
            Resource-Related Billing for the Repair Order
            Fixed Rate Billing for the Repair Order
         Creating a Repair Order with a Service Product
         Creating a Repair Order without a Service Product
         Posting Goods Receipt for Serviceable Materials
      Advance Shipment Process
         Advance Shipment
            Creating a Service Notification for Advance Shipme
            Creating a Service Order for Advance Shipment
            Status: Advance Shipment
      Service Processing Using Sales Order With Service Item
         Service Product
         Configurable Service Product
         Automatic Creation of Equipment
         Automatic Creation of Configurable Equipment
         Creating a Master Equipment
         Creating a Material Master for a Service Product
         Creating/Processing a Service Product
         Creating a Sales Order With Service Product
         Creating a Sales Order with Configurable Service Product
         Copying Configuration Data in Service Processing
      Controlling for Services
         Profitability Analysis for Services
         Controlling for a Service Order
         Controlling for a Service Contract
         Controlling for a Project
         Controlling With a Spare Part Order
         Differentiation of Cost Elements
   Orders (CS-SE/PM-WOC-MO)
      Order Types
         Maintenance Order
         Service Order
         Investment Order
         Calibration Order
         Refurbishment Order
         Spare Parts Order
      Order Processing: Internal Processing
         Creation of an Order
            Use of Default Values for the Order
            Creating an Order
            Creating an Order for the Notification
            Creating an Order Directly from a Notification
            Creating an Order and Notification Together
            Removing an Assignment Between Order and Notification
            Creating an Order with Different Planning Plant
            Creating an Investment Order
            Creation of a Calibration Order
            Calling Up the Initial Screen for Creating an Order
            Calling Up an Order in Change Mode
            Calling Up an Order in Display Mode
         Planning of an Order
            Establishment of Reference Object Data
            Operation
               Use of Operations and Sub-Operations
               Description of the Operations
               Describing an Operation
            Control Key
            Work Center
               Use of Performing Work Centers in the Operation
            Materials Planning
               Requirements Planning
               Change of Purchase Requisition
               Work Scheduling Using Bills of Material
               Scheduling and Displaying Bill of Material Components
               Specifying an Assembly
               Planning Stock Material
               Planning Non-Stock Material
               Planning Variable-Size Items
               Planning Material Using a Description
               Displaying, Changing and Deleting Material
            Personnel Planning
            Settlement Rule
               Creating or Generating a Settlement Rule
               Settlement Receiver
            Object List
               Working with Order Objects
               Changing an Object List
            Scheduling
               Scheduling Data
               Changing Scheduling Data
               Scheduling an Order
               Copying Project Dates as Basic Order Dates
               Displaying and Creating Dates
            Work with Task Lists
               Use of Task Lists
               Selection of Operations for a Task List
               Selection of Operations
               Copying Task List Default Values
               Selecting a Task List
               Changing and Displaying a Task List
               Selecting a General Task List
            Use of Service Specifications
            Costs
               Estimation of Costs
               Estimation of Planned Costs
            Additional Planning Functions
               Use of Relationships
                  Relationship
                  Networking Orders Using Relationships
                  Creating Relationships Using the Graphics Function
                  Creating Relationships Using the List Function
                  Displaying, Changing and Deleting Relationships
                  Creating Operations for Relationships Using the Graphics Functio
                  Performing a Loop Analysis
               Worklist for Planned Maintenance
               Order Hierarchy
                  Creating and Displaying a Sub-Order
               Use of Order Assignments
                  Assignment to Profit Centers
                  Assigning an Order to a Revision
                  Assigning an Order to a Project
                  Assigning an Order to an Investment Program Position
                  Assigning an Order to Funds Management
                  Assigning an Order to a Real Estate Object
                  Assigning an Order to a Joint Venture
               Execution Factor
                  Changing an Execution Factor
               Use of User Data
                  Entering User Data
               Budget Management
               Use of Production Resources/Tools
                  Assigning PRTs to an Operation
                  Deleting PRTs from an Operation
                  Scheduling PRTs
                  Using Quantity Management for PRTs
                  Using Status Management for PRTs
               Capacity Planning
                  Capacity Planning in Customer Service and Plant Maintenance
               Partner
                  Customizing for Partners
                  Partner Transfer
                  Entering Partner Data
         Control of an Order
            Material Availability Check
               Checking Stock Material Availability
            Availability Check for PRTs
               Checking Availability of PRTs
            Order Release
               Releasing an Order
               Putting an Order in Process
            Loading Order Data from the R/3 System onto PC
            Shop Papers
               Printing and Faxing of Shop Papers
               Printing Shop Papers
               Printing Shop Papers for Several Orders
               Delta Printing
               Calling Up a Print Preview and Print Log
               Faxing Shop Papers
               Displaying and Archiving Shop Papers
            Sending of Messages Using the Internet and SAPoffice®
            Sending of Short Messages Using Paging
            Use of Standard Texts
         Execution of an Order
            Use of Stock and Non-Stock Material
               Withdrawing Stock Material
               Displaying Goods Movements
         Completion of an Order
            Completing an Order
            Completion Confirmations (CS-SE-CON/PM-WOC-JC)
               Completion Confirmation
               Entry of Completion Confirmations for Orders
               Entry Options
                  Overall Completion Confirmation
                     Using the Overall Completion Confirmation
                     Individual Setting of Overall Completion Confirmation
                     Data for the Operation
                     Screen Areas for Confirmation Data
                  Individual Time Confirmation
                     Individual Time Confirmation Using Order/Operation Number
                     Individual Time Confirmation Using Confirmation Number
                     Individual Time Confirmation for a Standing Order
                  Collective Time Confirmation
                     Using the Collective Time Confirmation with Selection
                     Using the Collective Time Confirmation Without Selection
                        Using the Pool Function
                  Proposing Actual Data
                  Time Sheet
                  PDC Systems
               Time Completion Confirmation
                  Confirming Time Data
                  Entering a Completion Confirmation for Individual Capacities
                  Entering General Data on Attendance and Absence
                  List Entry of Time and Additional Data in Time Management
                  Time Collation
               Confirmation of Material Used
                  Confirming Material Used
                  Entering Used Material in Inventory Management
               Confirmation of Measurement and Counter Readings
                  Entering Measurement and Counter Readings
               Confirmation of Installation and Dismantling Information
                  Confirming Installation/Dismantling Information
               Goods Receipt for Refurbished Material
               Technical Completion Confirmation
                  Entering Notification Data Valid for the Whole Order
                  Entering Notification Data for an Object in the Object List
                  Assigning a New Notification and Confirming Data
               Confirmation of Services
                  Confirming Services
               Confirmation of External Services or External Material
               Cancellation of a Time Completion Confirmation
                  Canceling a Completion Confirmation with Known Number
                  Canceling a Completion Confirmation with Unknown Number
               Display of Completion Confirmations
                  Displaying Completion Confirmations for an Order
                  Displaying Completion Confirmations Generally
               Processing of Incorrect Completion Confirmations
               Cost Determination and Display of Actual Costs
                  Accounting Indicator in the Completion Confirmation
                  Displaying Key Figure Values
                     Example of Key Figure Value Display
               Decoupling of the Completion Confirmation Processes
            Resource-Related Billing
               Conversion Program
               Billing Process (CS)
                  Resource-Related Billing (CS)
                  Billing Scenarios
                     Billing - Scenario 1 (CS)
                     Billing - Scenario 2 (CS)
                     Billing - Scenario 3 (CS)
                     Billing - Scenario 4 (CS)
                     Billing - Scenario 5 (CS)
                     Billing - Scenario 6 (CS)
                  Reposting the Accounting Indicator
               Billing Process (PS)
                  Billing - Scenario 7 (PS)
               Processing the Expenditure View
               Editing the Sales Price View
               Settings: Sales Pricing and Billing
               Billing Options
               Creating Billing Requests
               Changing Billing Requests
               Canceling Billing Requests
            Technical Completion of an Order
               Performing a Technical Completion
               Canceling a Technical Completion
            Settlement of an Order
               Settling an Order and Order Group
               Settlement: Example
               Creating an Order Group for the Settlement
               Creating a Selection Variant for Collective Settlement
               Displaying Costs
            Business Completion of an Order
               Performing a Business Completion
               Canceling a Business Completion
               Issuing the System Status “Not Performed”
         Display and Processing of Special Order Data
            Screen Monitoring with Traffic Light Display
            Display of the Action Log
            Document Flow
               Document Selection
               Displaying Document Flow for Notifications or Orders
               Obtaining Maintenance Contract Information from the Document Flo
            System Status for Orders
            Setting a User Status
            Processing Orders Collectively
            Working with Hand-Held Devices
               Hardware and Software Used
               Function Modules Used
               Possible Errors
      Order Processing: External Processing
         Processing with an External Company as Work Center
         Processing with an Individual Purchase Order
         Processing with Service Specifications
         Processing Operations Externally
      Order Processing: Refurbishment of Repairable Spares
         Repairable Spare
         Creating a Refurbishment Order
         Posting a Goods Receipt for Refurbished Material
         Posting a Goods Issue for Material to be Refurbished
   Capacity Planning in Customer Service and Plant Maintenance
      Capacity Requirements Planning in Customer Service (CS-SE)
         Process for Capacity Requirements Planning in Customer Service
         Reconciliation of Capacity and Scheduling
            Inclusion of External Operations in Scheduling
            Consideration of Shift Breaks when Planning
            Available Capacity Versions in the Work Center
            Consideration of Existing Capacity Loads
            Capacity Load Records for the Production Work Center
         Calling Up Planning Boards
         Assignment of a Person to an Operation
            Selection of a Suitable Person
         Creation of Employee Requirements Records (Splits)
            Splitting and Scheduling an Individual Operation
            Creating Employee Requirements Records Automatically Using the S
            Changing Employee Requirements Records Created Automatically
         Dispatching of Requirements
         Deallocation of Requirements
            Deallocating Individual Operation Splits in the Order
         Change of the Order
         Display and Change of the Available Capacity
         Graphical Monitor
      Capacity Planning in Plant Maintenance (PM-WOC-CP)
         Process for Capacity Requirements Planning in Plant Maintenance
         Reconciliation of Capacity and Scheduling
            Inclusion of External Operations in Scheduling
            Consideration of Shift Breaks when Planning
            Available Capacity Versions in the Work Center
            Consideration of Existing Capacity Loads
            Capacity Load Records for the Production Work Center
         Calling Up Planning Boards
         Assignment of a Person to an Operation
            Selection of a Suitable Person
         Creation of Employee Requirements Records (Splits)
            Splitting and Scheduling an Individual Operation
            Creating Employee Requirements Records Automatically Using the S
            Changing Employee Requirements Records Created Automatically
         Dispatching of Requirements
         Deallocation of Requirements
            Deallocating Individual Operation Splits in the Order
         Change of the Order
         Display and Change of the Available Capacity
         Graphical Monitor
   CS-SDL Interface (CS-SE-SD)
      External Scheduling
         External Scheduling in the Order
         External Scheduling in the Completion Confirmation
         External Scheduling in Maintenance Planning
         External Scheduling in the Graphical Monitor
      Notes on Function Modules
         Function Module PM_ORDER_EXTERN_SCHED_DIALOG
         Function Module PM_ORDER_EXTERN_SCHED_DEFAULT
         Function Module PM_ORDER_EXTERN_SCHED_APPOINT
         Function Module PM_ORDER_EXTERN_BOOK_DEFAULT
         Function Module READ_WORKLOAD
         Function Module PM_ORDER_EXTERN_MASTER_DATA
      Scheduling an Order Externally
   Completion Confirmations (CS-SE-CON/PM-WOC-JC)
      Completion Confirmation
      Entry of Completion Confirmations for Orders
      Entry Options
         Overall Completion Confirmation
            Using the Overall Completion Confirmation
            Individual Setting of Overall Completion Confirmation
            Data for the Operation
            Screen Areas for Confirmation Data
         Individual Time Confirmation
            Individual Time Confirmation Using Order/Operation Number
            Individual Time Confirmation Using Confirmation Number
            Individual Time Confirmation for a Standing Order
         Collective Time Confirmation
            Using the Collective Time Confirmation with Selection
            Using the Collective Time Confirmation Without Selection
               Using the Pool Function
         Proposing Actual Data
         Time Sheet
         PDC Systems
      Time Completion Confirmation
         Confirming Time Data
         Entering a Completion Confirmation for Individual Capacities
         Entering General Data on Attendance and Absence
         List Entry of Time and Additional Data in Time Management
         Time Collation
      Confirmation of Material Used
         Confirming Material Used
         Entering Used Material in Inventory Management
      Confirmation of Measurement and Counter Readings
         Entering Measurement and Counter Readings
      Confirmation of Installation and Dismantling Information
         Confirming Installation/Dismantling Information
      Goods Receipt for Refurbished Material
      Technical Completion Confirmation
         Entering Notification Data Valid for the Whole Order
         Entering Notification Data for an Object in the Object List
         Assigning a New Notification and Confirming Data
      Confirmation of Services
         Confirming Services
      Confirmation of External Services or External Material
      Cancellation of a Time Completion Confirmation
         Canceling a Completion Confirmation with Known Number
         Canceling a Completion Confirmation with Unknown Number
      Display of Completion Confirmations
         Displaying Completion Confirmations for an Order
         Displaying Completion Confirmations Generally
      Processing of Incorrect Completion Confirmations
      Cost Determination and Display of Actual Costs
         Accounting Indicator in the Completion Confirmation
         Displaying Key Figure Values
            Example of Key Figure Value Display
      Decoupling of the Completion Confirmation Processes
   Cross-Application Time Sheet (CA-TS)
      The Data Entry Screen for the Time Sheet
         The Data Entry View, Release View, and Variable View
         The Time Sheet Worklist
      Prerequisites for Time Sheet Users
      Customizing Settings for Data Entry Profiles
      Implementing User Parameters
      Processing Status
      Process for Creating Time Sheets
         Time Sheet Data Entry
            Calling the Time Sheet for One Personnel Number
            Calling the Time Sheet to Record Data for Several Personnel Numb
            Calling the Time Sheet to Record Data for Several Personnel Numb
            Recording Working Times
            Resetting Entries
            Copying Rows
            Splitting Rows
            Copying Working Time Attributes from the Previous Period
            Distributing Hours Over Several Days in a Period
            Displaying Days Off
            Copying Information from the Worklist
            Cancelling Approved Records
            Changing Rejected Records
            Branching to Trip Costs and Material Withdrawals
               Posting a Material Withdrawal
               Entering Basic Trip Data
            Entry of Additional Information
               Entering a Short Text for a Record
               Entering a Long Text for a Record
               Entering Information on a Confirmation
            System Checks and Messages During Data Entry
               Checking Your Entries
               Processing Errors and Warnings
            Data Entry Screen Customizing
               Changing the Data Entry Period
               Displaying the Weekday or Date
               Changing the Position of Columns
                  Hiding and Reducing Columns
                  Showing and Enlarging Columns
                  Saving Your Personal Column Settings
         Release of Data
            Releasing Data on Saving
            Releasing Data Using the Release View
         Approval Procedure
            Issuing Approvals
            Approving Data Using SAP Business Workflow
            Issuing Approvals (CA-TS)
               Technical Implementation of the SAP Business Workflow for Issuin
               Preparation and Customizing of the Approval Workflow
               Using and Linking to Application Functions
      Information on Working Times Recorded
         Obtaining Information on Icons and Colors
         Obtaining Information on the Processing Status, Document Number,
         Calling the Variable View
         Displaying the Short Text
         Displaying the Long Text
         Displaying Confirmation Information
         Displaying the Predecessor of a Data Record
         Displaying Detailed Information
         Displaying Detailed Information on Working Time Attributes
         Displaying Follow-on Documents and Outstanding Postings
         Information System
            Reports: Information on Time Sheet Data
               Selecting Employees for Reports
               Displaying Reports
            Displaying Records Using the Document Display Report
         Time Sheet: Time Leveling (RCATSCMP)
            Examples: Checking Time Sheets
      Process for Transferring Data to the Target Components
         Transfer of Time Sheet Data to the Target Components
            Data Transfer to All Components
         Data Transfer to Controlling (CO)
            Transfer to Controlling
            Entry of Statistical Key Figures
            Time Sheets in Cost Object Controlling
            Actual Cost Determination for Time Sheet Hours
         Data Transfer to Plant Maintenance/Customer Service (PM/CS)
            Transfer to Plant Maintenance/Customer Service
            PS/PM/CS: Creating an Index for Table AFRU
            PS/PM/CS: Postprocessing Transferred Data
         Data Transfer to Project System (PS)
            Transfer to Project System
            PS/PM/CS: Creating an Index for Table AFRU
            PS/PM/CS: Postprocessing Transferred Data
         Data Transfer to Materials Management (MM-SRV)
            Master Data Maintenance for External Employees
            Service Entry with Reference to an Operation
         Data Transfer to Human Resources (HR)
            Transfer to Human Resources
            Immediate Transfer to HR
            Entry of Attendances and Absences for HR Time Management
               Extended Functions for Users of HR Time Management
               Extended Checks for Users of HR Time Management
               Using Information from HR Time Management
                  Showing or Hiding Target Hours
                  Copying Target Hours
                  Documenting Remaining Hours
            Determining a Different Payment
            Entry of Employee Remuneration Information
         For Users of HR: Data Entry Scenarios for Cost Accounting
            Assignment of Personnel Costs to the Master Cost Center
            Assignment of Personnel Costs to the Receiver Object
            Assignment of Personnel Costs to the Sender
            Activity Allocation Between Master and Sender Cost Center
         Reorganization of Interface Tables
            Reorganizing Interface Tables
      Assignment of Authorizations for the Time Sheet
         Example: HR Authorizations for Entering Data in the Time Sheet
      Time Sheet Data Archiving
      Technical Background to the Time Sheet
         The Database Table for the Time Sheet (CATSDB)
         The Interface Tables for the Time Sheet
         Processing Status
         Cancelation of Time Sheet Data
         Example: Recording Attendances for Human Resources
      Internet Time Sheet
   Billing
      Periodic Billing
      Resource-Related Billing
         Conversion Program
         Billing Process (CS)
            Resource-Related Billing (CS)
            Billing Scenarios
               Billing - Scenario 1 (CS)
               Billing - Scenario 2 (CS)
               Billing - Scenario 3 (CS)
               Billing - Scenario 4 (CS)
               Billing - Scenario 5 (CS)
               Billing - Scenario 6 (CS)
            Reposting the Accounting Indicator
         Billing Process (PS)
            Billing - Scenario 7 (PS)
         Processing the Expenditure View
         Editing the Sales Price View
         Settings: Sales Pricing and Billing
         Billing Options
         Creating Billing Requests
         Changing Billing Requests
         Canceling Billing Requests
      Static Billing
   PM/CS - Plant Maintenance & Customer Service: Workflow Scenarios
      Maintenance Notifications (PM-WOC-MN)
         Processing of a Maintenance Notification (PM-WOC-MN)
            Technical Realization (PM-WOC-MN)
            Process for Workflow Template WS20000317
            Preparation and Customizing (PM-WOC-MN)
            Operation and Link to Application Functions (PM-WOC-MN)
         Completion of a Task (PM-WOC-MN)
            Technical Realization (PM-WOC-MN / Completing a Task)
            Process for Workflow (PM-WOC-MN / Completing a Task)
            Preparation and Customizing (PM-WOC-MN / Completing a Task)
            Operation/Link to Application Functions (PM-WOC-MN/Complete Task
         Processing an Outstanding Maintenance Notification (PM-WOC-MN)
            Technical Realization (PM-WOC-MN / Outstanding PM Notification)
               Object Type BUS2038 (Maintenance Notification)
               Standard Task TS00008314 (Process Outstanding PM N
               Workflow Template WS00200065 (PM: Processing a Notification)
               Steps in a Workflow
            Preparation and Customizing (PM-WOC-MN / Outstanding Maintenance
               Processing the Organizational Structure
               Perform Task-Specific Customizing
                  Activate Event-Receiver Linkage
            Operation and Link to Application Functionality (P
         Processing an "In Process" Maintenance Notification (PM-WOC-MN)
            Technical Realization (PM-WOC-MN / PM Notification in Process)
               Object Type BUS2038 (PM Notification)
               Standard Task TS00008314 (PM Task Process Notifica
               Workflow Template WS00200095 (PM: Putting a Notification in Proc
               Steps in a Workflow
            Preparation and Customizing (PM-WOC-MN / Maintenance Notificatio
               Processing the Organizational Structure
               Perform Task-Specific Customizing
                  Activate Event-Receiver Linkage
            Operation and Link to Application Functionality (P
         Completing a Maintenance Notification (PM-WOC-MN)
            Technical Realization (PM-WOC-MN / Completing PM Notification)
               Object Type BUS2038 (Maintenance Notification)
               Standard Task TS00008316 (Complete)
               Workflow Template WS00200075 (PM: Completing a Notification)
               Steps in a Workflow
            Preparation and Customizing (PM-WOC-MN / Completing a Maintenanc
               Processing the Organizational Structure
               Perform Task-Specific Customizing
                  Activate Event-Receiver Linkage
            Operation and Link to Application Functionality (P
      Maintenance and Service Orders (PM-WOC-MO / CS-SE)
         Purchase Order Change (PM-WOC-MO / CS-SE)
            Technical Realization (PM-WOC-MO / CS-SE)
            Preparation and Customizing (PM-WOC-MO / CS-SE Purchase Order Ch
            Operation & Link to Application Functions (PM-WOC-MO / CS-SE Pur
         Notifying the Order Creator(PM-WOC-MO)
            Technical Realization (PM-WOC-MO / Notification of the Order Cre
               Object Type BUS2007 (Maintenance Order)
               Standard Task TS20000004 (PMO Order Created)
               Standard Task TS20000005 (PMO Order Released)
               Standard Task TS20000006 (PMO Order Completely Con
               Standard Task TS20000007 (PMO Order Technically Co
               Standard Task TS20000031 (Business Completion for
               Workflow Template WS20000021 (PMO Author)
               Scenario Procedure
            Preparation and Customizing (PM-WOC-MO / Notification of Order C
               Processing the Organizational Structure
               Performing Task-Specific Customizing
                  Activating Event-Receiver Linkage
            Operation and Link to Application Functionality (P
         Notifying the Employee Responsible (PM-WOC-MO)
            Technical Realization (PM-WOC-MO / Notification of the Employee
               Object Type BUS2007 (Maintenance Order)
               Standard Task TS20000064 (PMO Order is Released by
               Workflow Template WS20000014 (PM: PMO Maintenance Planner)
               Scenario Procedure
            Preparation and Customizing (PM-WOC-MO / Notification of Employe
               Processing the Organizational Structure
               Performing Task-Specific Customizing
                  Activate Event-Receiver Linkage
            Operation and Link to Application Functionality (P
         Notifying the Work Centers Involved (PM-WOC-MO)
            Technical Realization (PM-WOC-MO / Notification of Work Centers
               Object Type AFVC_PM (Maintenance Order Operation)
               Standard Task TS20000015 (PMO Order Released)
               Standard Task TS20000056 (PMO Operation Completely
               Standard Task TS20000016 (PMO Operation Completely
               Workflow Template WS20000031 (PMO Operation)
               Scenario Procedure
            Preparation and Customizing (PM-WOC-MO / Notification of Work Ce
               Processing the Organizational Structure
               Performing Task-Specific Customizing
                  Activate Event-Receiver Linkage
            Operation and Link to Application Functionality (P
      Service Notifications (CS-PM-SN)
         Processing of a Service Notification (CS-CM-SN)
            Technical Realization (CS-CM-SN)
            Process for Workflow Template WS20000318
            Preparation and Customizing (CS-CM-SN)
            Operation and Link to Application Functions (CS-CM-SN)
         Completion of a Task (CS-CM-SN)
            Technical Realization (CS-CM-SN / Completing a Task)
            Process for Workflow (CS-CM-SN / Completing a Task)
            Preparation and Customizing (CS-CM-SN / Completing a Task)
            Operation and Link to Application Functions (CS-CM-SN / Completi
         Processing an Outstanding Service Notification (CS-CM-SN)
            Technical Realization (CS-CM-SN / Outstanding Service Notificati
               Object Type BUS2080 (Service Notification)
               Standard Task TS00008336 (Process Outstanding Serv
               Workflow Template WS00200096 (Processing a Service Notification)
               Steps in a Workflow
            Preparation and Customizing (CS-CM-SN / Outstanding Service Noti
               Processing the Organizational Structure
               Perform Task-Specific Customizing
                  Activate Event-Receiver Linkage
            Operation and Link to Application Functionality (P
         Processing a Service Notification in Process (CS-CM-SN)
            Technical Realization (CS-CM-SN / Service Notification in Proces
               Object Type BUS2080 (Service Notification)
               Standard Task TS00008336 (Process Service Notifica
               Workflow Template WS00200099 (Putting a Service Notification in
               Steps in a Workflow
            Preparation and Customizing (CS-CM-SN / Service Notification in
               Processing the Organizational Structure
               Perform Task-Specific Customizing
                  Activate Event-Receiver Linkage
            Operation and Link to Application Functionality (P
         Completing a Service Notification (CS-CM-SN)
            Technical Realization (CS-CM-SN / Completing a Service Notificat
               Object Type BUS2080 (Service Notification)
               Standard Task TS00008338 (Complete Service Notific
               Workflow Template WS00200098 (Completing a Service Notification)
               Steps in a Workflow
            Preparation and Customizing (CS-CM-SN / Completing a Service Not
               Processing the Organizational Structure
               Perform Task-Specific Customizing
                  Activate Event-Receiver Linkage
            Operation and Link to Application Functionality (P
   SAP ArchiveLink - Storage Scenarios (PM)
      Storage of Outgoing Documents (PM-WOC-MO)
         Business Background (PM-WOC-MO)
      Storage of Incoming Documents (PM-WOC-MO)
         Business Background (PM-WOC-MO)
            Process Flow for Storage for Subsequent Entry (PM-WOC-MO)
      Storage of Incoming Documents (PM-SMA-SC)
         Business Background (PM-SMA-SC)
            Process Flow for Storage for Subsequent Entry (PM-SMA-SC)
      Storage of Outgoing Documents (PM-SMA-SC)
         Business Background (PM-SMA-SC)
      Storage of Incoming Documents (PM-WOC-MN)
         Business Background (PM-WOC-MN)
            Process Flow for Storage for Subsequent Entry (PM-WOC-MN)
      Storage of Outgoing Documents (PM-WOC-MN)
         Business Background (PM-WOC-MN)
   PM/CS - Data Transfer in Plant Maintenance and Customer Service
      PM/CS: Data Transfer