Show TOC

Assign Material Update Structure to a Valuation Area

In this section, you can assign a material update structure to one or morevaluation areas.

Requirements

You have defined a material update structure.
Define material update structure

You have activated a corresponding valuation area in the material ledger.
Activate valuation area for the material ledger

Activities

1. Choose New entries.
2. Enter a valuation area and a material update structure.
3. Save your entry.