If you set this indicator the itemization is saved in addition to the cost component split.
For a material cost estimate, however, this indicator has no effect if you have not set the indicator Saving allowed .
When you save a
material cost estimate with quantity structure you can choose to save the itemization in a dialog box by setting the indicator Default parameters can be changed by user. In this case the indicator simply supplies the default value.
If you set
parallel valuation approaches/transfer prices within group costing then you have to save the itemization.