Ignore prod cost est w/o qty structure

Definition

Determines whether a cost estimate with quantity structure can access data that was produced by a cost estimate without quantity structure .

Use

You set this indicator if you do not want to work with a cost estimate without quantity structure.

In the costing view of the material master record, you can use the With quantity structure indicator to specify that the material should be costed either with or without a quantity structure. If the Ignore cost estimate w/o qty structure indicator in the costing variant is set, the system will ignore the entry in the material master record.

In sales order costing, this switch is effective only in connection with transfer control according to the principle described above.