Maintaining an Individual Operation
Prerequisites
You can make changes to the order data both in create and in change mode.
Procedure
Choose Logistics
®
Production
®
Shop Floor Control
®
Order
®
Change.
Specify the number of the order that you want to change.
- Choose .
The initial screen for production orders appears.
- Choose .
- Select one or more operations.
- The operation data is divided into two sections that you can access in different ways.
To go to the tab pages, first choose and then one of the following tab pages:
- General
- StandardVals
- Ext. processing
- Interop. times
- Std value determin.
- Splitting
- Overlapping
- Dates
- User Fields
- SO delta
- Qty/activities
(display-only fields)
- Confirmed dates
(display-only fields)
- Assignment of reqmts
- Qualificats
- Long text:
For each plant and order type, you can define your own layout of the tab pages for the operations (Customizing for Shop Floor Control by choosing Screen Control ®
Define User-Specific Tab Pages
®
Define Operation Detail Screens).
To go to the operation detail screens, choose
- Operation
®
Purchase requisition
- Operation
®
Object dependency
- Operation
®
Long text
- Make the necessary changes and save the order.