Check Date
Control
In product costing, date control is involved in
creating the quantity structure and the value structure on the basis of
various dates. These dates determine the following:
These dates do not
play any role in sales order costing.
The date on which
the routings and BOMs are read from the database
- when the quantity structure is
valuated
The date on which
prics for materials, internal activities and external activities are
determined
The date control ID determines the
following:
- whether the dates can be changed by the user
when costing is called up
- what date is proposed or displayed in the cost
estimate
Standard
settings
The standard system contains predefined date
control IDs that you can use without making any changes.
Actions
Check the supplied date control IDs to see if
they meet your requirements.
To create new date control IDs:
1. Choose
New entries.
2. Enter an
alphanumerical key as the date control ID.
3. Enter a text
for the date control ID.
4. Specify
whether the costing date (enter key date) can be changed by the
user.
5. Specify the
default costing date.
6. Specify
whether the "To" date can be changed by the user.
7. Specify the
default "To" date.
8. Specify
whether the quantity structure date can be specified by the user.
9. Specify the
default quantity structure date.
10. Specify
whether the valuation date can be changed by the user.
11. Specify the
default valuation date.