Data for this Example 

Controlling area

1000

Company code

1000

Plant

1300

Project currency

DEM

Project

E-#### (#### is the number of the sales order from the IDES scenario Make-to-Order Production of Elevators).

Project profile

1000

Costing sheet

130000

Strategy for generating the settlement rule

10

Results analysis key

130000

RA version

000

PA Transfer Structure

30

Settlement profile of the billing element

130000 (to be settled in full = 100%)

Settlement profile of the lower-level WBS elements

130002 (not to be settled)

Period

Current period

Fiscal year

Current fiscal year

Operating concern

IDEA

Type of Profit. Analysis

Costing-based