Controlling area |
1000 |
Company code |
1000 |
Plant |
1300 |
Project currency |
DEM |
Project |
E-#### (#### is the number of the sales order from the IDES scenario Make-to-Order Production of Elevators). |
Project profile |
1000 |
Costing sheet |
130000 |
Strategy for generating the settlement rule |
10 |
Results analysis key |
130000 |
RA version |
000 |
PA Transfer Structure |
30 |
Settlement profile of the billing element |
130000 (to be settled in full = 100%) |
Settlement profile of the lower-level WBS elements |
130002 (not to be settled) |
Period |
Current period |
Fiscal year |
Current fiscal year |
Operating concern |
IDEA |
Type of Profit. Analysis |
Costing-based |