Basic Settings
for Material Costing
Here you make general settings for cost
estimates with and without quantity structure:
In this step you can
specify how materials that are assigned to the same
cost element are controlled separately for the purposes of
overhead allocation. This allows you to apply overhead to direct costs by cost
element and origin rather than only by cost element.
In this step you
create overhead groups for each
valuation area and assign these groups to overhead keys. You can
differentiateoverhead rates according to the materials to which overhead is to
be allocated by entering an overhead group in the material master record of
the product being manufactured and specifying the overhead key in the
costing sheet.
In this step you can
use Activity-Based Costing to allocate overhead as an alternative to the
conventional method.
In this step you
define the
In this step you can
check the Customizing settings by specifying a costing variant.
In this step you
make Customizing settings for message management.