Show TOC

Transport Settings for Master Data

The master data objects are dependent on controlling area and/or the chart of accounts.

You can transport the following system settings for master data:

Master data 1

Master data 2

The R/3 System places the selected object in a correction request.

You can transfer the data to the target system using the functions available under transport.

Note

a) The system deletes the master data that already exists in the target system in the same controlling area or in the same chart of accounts.
b) The system imports the master data contained in the correction.
Caution
If, prior to the transport, you have already created master data in the target system (whether manually or through a different transport), this data is lost when the transport takes place.
Since in the target system the master data but not the transaction data is deleted, transporting data into a system that already contains data can lead to inconsistencies. You should therefore maintain the master data in the target system manually.
Example
-The chart of accounts-dependent part of cost elements
-The controlling area-dependent part of cost elements for
all controlling areas with this chart of accounts

Recommendations

Always transport the following objects together to prevent

Activities

1. Determine which data you want to transport.
2. Choose the corresponding controlling area and/or chart of accounts.
3. Use Include in order to insert data in a correction order, or remove data with Delete from order.
Note
Removal from the correction order is possible only if the correction order has not been released to a transport job.
4. If you transport cost element default settings, you must create and run a batch input session after the import to the target system in order to save the cost elements.
Ensure that the G/L accounts in FI are saved for the chart of accounts in the target system.

Additional information

For more information on the processing change requests, see the SAP Library under BC - Basis Components -> Change and Transport System (BC-CTS) -> Change and Transport System - Overview -> Transactions and Tools in the CTS -> Change and Transport Organizer -> Workbench Organizer as well as -> Transport Organizer.