Show TOC

Assign Templates to Cost Objects

In this step you specify how the templates for the calculation of the process costs are selected. Because the list of possible processes can be valid for multiple materials and orders, the template is selected through a costing sheet and an overhead key , rather than through the material being manufactured.

Because templates can be used in many different areas of Controlling, you must specify the environment (such as material cost estimate or Cost Object Controlling) in which the template can be used.

Requirements

You have performed the following steps:

Activities

To define the template determination:

1. Choose New entries.
2. Enter the following data:
3. Save your entries.