Manufacturing Orders

Here you define the parameters that influence preliminary costing, simultaneous costing, and the period-end closing activities of a manufacturing order. You can make settings in the Product Cost by Order component for the following orders:

You define the following:

Costing variants contain the control parameters for preliminary costing and for simultaneous costing.
A valuation variant is a parameter in a costing variant and controls the following:
The order type determines such things as:
In the default values for each order type and plant, you determine which parameters are proposed as defaults values for Cost Object Controlling (such as the costing variant and the results analysis key).
If you are using production orders in CO; the costing variant is defaulted through the planing profile.