In this activity you can create your own Controlling level for transactions that you would like to differentiate in the material ledger, further than the standard system offers.
The naming rules are relevant in the plants in
which actual costing is active.
Activate
Actual Costing
Use the Controlling levels in the standard system.
In the dialog box, you can also call up a list of Controlling levels contained in the standard system as well a list of your own Controlling levels.