Show TOC

lot size variance

Product Cost Controlling (CO-PC)

Difference between planned fixed costs and allocated actual fixed costs.

Lot size variances arise when part of the total cost of an order or cost object hierarchy remains the same as the quantity manufactured changes.

Example:

The fixed costs of an operation (such as setup costs) remain the same regardless of how often the operation is repeated.