New Developments in the Planning Table
Scope of Functions
- With the user-defined period split in the planning table, you can
define the display of the periods you are planning to suit your own
requirements. Increasing periods are displayed in the period split -
this means, you can set how many days are to be displayed in shifts,
how many weeks are to be displayed in days and exactly how many weeks
are to be displayed. You can also specify whether the days are only to
be displayed with the date or whether you also want the system to
display the particular day of the week. You cannot, however, convert the display to shifts and days first and then back to shifts.
- With the user exit PTRM0001, you have the option of changing the text
column in the planning table. You can change the existing row descriptions and adapt them as required.
- The way to access the planning table has been changed so that the
additional selection criteria and the period of examination is now
displayed in tab pages in the lower section of the initial screen.
- When sorting by material (material view) or sorting by lines (line
view), you can use a pushbutton to go from material to material or from line to line.
- In the planning table, you can convert the unit of measure for all
materials instead of having to change it for each material individually as was previously the case.
- In the planning table, you can set a manual firming date which is
displayed in the material overview and in the planning situation.