Assigning a Stability Bill-of-Material to a Stability StudyIn a stability bill-of-material (BOM), you document the components, substances, or ingredients that make up the material or product to be tested, from a stability or shelf-life perspective. In a stability study for a self-produced drug, for example, the laboratory is usually more interested in the proportion of active ingredients and chemical composition of the compound, rather than the material BOM associated the process order or production order. The stability BOM is used for documentation purposes only. In a BOM, you can also describe the compound or product using text components, which can be especially important for newly developed products.
This procedure describes how you can assign a stability bill-of-material (BOM) to a stability study and later edit the BOM, if necessary. You assign and process a BOM using corresponding follow-up functions in the action box. When you assign a BOM to a stability study, the action is documented as a task in the quality notification.
Note
You can assign a BOM to a study more than once. This may be necessary, for example, if you want to use a BOM other than the one that was previously assigned to the stability study.
You can assign a stability BOM to a stability study at any time, as long as the stability study is active. This is an optional activity and does not influence any other process steps in the stability study.
When you assign a BOM, you must specify an alternative bill-of-material from a bill-of-material group. This is necessary because the substance or product to be tested may have different bills-of-material (alternatives) for different production methods.
You have created a stability study in the system.
From the
SAP Easy Access
menu, choose
.
The initial screen for changing a stability study appears.
On the initial screen, enter the key of the stability study you want to process and then choose
Enter
.
The screen for changing the stability study data appears.
In the action box on the right side of the screen, choose the follow-up function
Assign Bill-of- Material
.
A dialog box for assigning a bill-of-material appears. This dialog box contains system proposals for the material, plant, and usage fields.
If necessary, change any of the proposed values.
Enter a value for the
Alternative
field. If necessary, use the possible entries help to select a value.
If you want to assign the bill-of-material with reference to a change number, enter this number in the
Change Number
field of the
Validity
group.
If you specify a change number, change the
Valid From
date if necessary.
Choose
Assign Bill-of-Material
to assign the bill-of-material to the study.
The stability study is automatically saved.
The stability BOM is assigned to the stability study.