Displaying the Scheduling Overview as a Graphic

Use

Using this report, you can display a scheduling overview of testing schedules for one or more stability studies. For the selected testing schedule items, the system will display all test dates for the selection period, according to their processing statuses. When you select the testing schedules, you can use various criteria to narrow your selection. The result of the selection is a graphic scheduling overview that conforms to your selection criteria and which displays the testing dates for all selected testing schedule items (with or without information about the associated testing schedule), each with a graphic symbol that corresponds to its status.

In the graphic, a selected testing schedule item is displayed with the item number and item short text. The explanations of the graphic symbols are described in the legend.

You can sort the testing schedule items in the graphic by:

  • Planned date (all)

  • Planned date (waiting)

  • Testing schedule key

  • Testing schedule item number

Procedure

  1. From the SAP Easy Access menu, choose Start of the navigation path Logistics Next navigation step Quality Management Next navigation step Stability Study Next navigation step Stability Planning Next navigation step Testing Schedule Next navigation step Scheduling Overview Graphic End of the navigation path .

The initial screen for the graphic scheduling overview appears.

  1. Enter your selection criteria and then choose Execute .

A graphic display of results conforming to your selection criteria is displayed.