Deactivating a Storage ConditionIf you want to discontinue the stability tests for a storage condition for an undetermined period of time, with the option of resuming testing at a later date, you can deactivate the stability study for this storage condition. When you do this, the system locks the stability sample for this storage condition. This locked status prevents the deadline monitoring function from creating an inspection lot for the storage condition when a test date comes due.
If inspection lots have already been created for the storage condition for future test dates that lie within in this inactive period, you must manually cancel these inspection lots .
If the deadline monitoring function determines that inspection lots cannot be created for a certain test date because all stability samples scheduled to be tested on this date are locked, the test date still receives the status
Called
. You cannot, however, confirm and complete this test date using the functions for inspection lot processing, since no inspection lots exist for this test date. In this case, you must
complete the test date manually
in the testing schedule.
The physical sample for the storage condition is not locked (that is, the storage condition is active).
From the
SAP Easy Access
menu, choose
.
The initial screen for changing a stability study appears.
On the initial screen, enter the key of the stability study you want to process and then choose
Enter
.
The screen for changing the stability study data appears.
In the action box on the right side of the screen, choose the follow-up function
(De-)Activate Storage Condition
.
A dialog box for locking/unlocking the storage conditions appears.
Select the row(s) in the table which contains the storage condition(s) you want to deactivate.
Choose one of the following options in the dialog box, depending on how you want to proceed:
Lock/Unlock Change Storage Conditions, Save/Exit Notification
Lock/Unlock Change Storage Conditions, Save/Change Notification