Manual Test Plans

Use

A manual test plan consists of a sequence of test steps that are performed during testing to determine that a control is operating effectively. A manual test plan may test either a manual or an automated control. If you define the test method as manual, a manual test plan applies.

When you create a manual test plan, you assign the following attributes to it:

  • Test steps comprising the test plan and the required steps

  • Sampling methodology and initial sample size

  • Indicator that says whether or not a test step failure results in a failed control and requires further action

All required test steps must be completed, in sequence, before the final validation of a manual control.

Prerequisites

A control must be in place before a test plan can be assigned, and the control must have Test Automation set to Manual. For more information, see Business Processes.

Features

This function allows you to:

  • Create, view, and edit manual test plans

  • Assign manual test plans to controls at the global or at the compliance-specific level

  • Set validity dates for test plans

  • Assign manual test plans to one or more central controls

Activities