Archiving Work Centers and Capacities (PP-BD-WKC) Archiving object
PP_WKC
for the archiving of work centers and capacities in the
Production Planning and Control (PP)
component.
Note
This archiving object has been revised within the framework of a project for standardizing and optimizing the data archiving process. You can use the standardized archiving object by activating the business function
Data Archiving: Standardization of Archiving Objects
(technical name DA_ARCHOBJ_STANDARD_1). For more information, refer to the business function documentation in the Switch Framework (transaction SFW5) under
Data Archiving: Standardization of Archiving Objects
.
Note
You can use the archiving object within the framework of
Information Lifecycle Management
. A prerequisite for this is that you have activated the associated business functions. The system then additionally shows the
ILM Actions
frame. With these actions, you can carry out an archiving process in which the retention periods stored in the Information Retention Manager are evaluated, for example. Furthermore, you can create snapshots (copies) of data or destroy data that satisfies the applicable prerequisites. For more information, see the
ILM Actions in Write Program
section of
ILM Enhancements for Data Archiving
.
You can archive work centers that you no longer need. During the archiving process, the system writes archive files for the data and deletes the data from the system once it has been archived successfully.
You can archive and delete work center data and work center capacities with the archiving object PP_WKC. You can delete the capacities that are directly assigned to the work center. However, you cannot delete pooled capacities and reference capacities.
There is currently no provision for displaying and reloading the archived data.
The archiving object PP_WKC comprises the following data of the work center and the capacities, as well as the following Customizing settings:
Work center header data (CRHD)
Short descriptions of the work center (CRTX)
Assignment of work center to cost center (CRCO)
Assignment of work center to grouping subsystem connection (T705R)
Descriptions of the grouping subsystem connection (T705X)
Assignment of CAP procedure to work centers (VERTE)
CAP procedure texts (VERFT)
Classification (archiving class CLASSIFY)
Change documents (archiving class CHANGEDOCU)
Long text (archiving class TEXT)
Links to PD (HRP1001)
Assignment of capacity to work center (CRCA)
Capacity header (KAKO)
Descriptions of capacity (KAKT)
Intervals of available capacity (KAZY)
Capacity shift values (KAPA)
Assignment of alternative units of measure to capacity (KAPE)
Shift definition (daily work schedule) (T550A)
Work break schedule (T550P)
Links to PD (HRP1001)
To record the presettings under which the work centers and capacities have been archived, the following Customizing settings are archived:
Settings for formulas:
Formula parameters (TC20)
Texts for formula parameters (TC20T)
Standard value keys (TC21)
Texts for standard value keys (TC21T)
Work center formulas (TC25)
Short descriptions for formulas (TC25T)
General settings:
Person responsible for work center (TC24)
Task list use (TC23)
Texts for task list use (TC23T)
You can select work centers for archiving according to the following criteria:
Plant
Work center
Work center category
Person responsible for work center
In addition to the selection criteria mentioned, you can select work centers via the deletion flag.
Caution
The archiving and deletion of work centers is carried out independently of the deletion flag.