Show TOC

View Layout for Change NumberLocate this document in the navigation structure

In the standard system, we provide a General view that displays basic information about the change number. We also provide the following further views, which display related objects for the change number:

  • Changed Materials (Actual/Planned)

    This displays all materials that have been created, changed, or deleted with the change number. Materials that are intended to be changed in the future with this change number are also displayed.

  • Changed Material BOMs (Actual/Planned)

    This displays all bills of material (BOMs) that have been created, changed, or deleted with the change number. BOMs that are intended to be changed in the future with this change number are also displayed.

  • Changed Documents (Actual/Planned)

    This displays all documents that have been created, changed, or deleted with the change number. Documents that are intended to be changed in the future with this change number are also displayed.

  • Changed Document Structures (Actual/Planned)

    This displays all document structures that have been created, changed, or deleted with the change number. Document structures that are intended to be changed in the future with this change number are also displayed.

  • Accompanying Documents

    This displays all documents that are assigned to the change number as accompanying documents.

  • Access Control Contexts

    This displays the contexts in which the change number belongs. You can also see whether the context is an owning context or a compound context.

  • Synchronization BOM to BOM

    This displays all synchronizations of engineering bills of material with manufacturing bills of material that were performed with this change number.

  • Synchronization PSM to BOM

    This displays all synchronizations of engineering product structures or product assemblies with manufacturing bills of material that were performed with this change number.

  • Assignment for Synchronization Recipe to BOM

    This displays the following:

    • The assignment of the synchronization unit to the recipe version that was scheduled for synchronization or was already synchronized.

    • The change number of the production bill of material

    • The status of the assignment

    • The recipe that was synchronized or planned for synchronization

    • The production bill of material

  • Synchronized Change Numbers

    This displays the change numbers that are used for a synchronization.

  • Changed Recipes

    This displays all recipes that have been created, changed, or deleted with the change number. Recipes that are intended to be changed in the future with this change number are also displayed.

  • Changed Specifications

    This displays all specifications that have been created, changed, or deleted with the change number. Specifications that are intended to be changed in the future with this change number are also displayed.

  • Changed Variants (Actual/Planned)

    This displays all variants (product variant, product item variant, assembly header, assembly item) that were created or changed with the change number. Variants that are intended to be changed in the future with this change number are also displayed.