A phrase is created without a change number; phrase item and phrase set assignment are edited.
The data for the phrase header, the phrase item, and the phrase set assignment is therefore valid from 01/01/0001 through 12/31/9999.
You can also create a phrase with a change number, for example, with a valid-from date in the future (01/01/2005). The data for the phrase header, the phrase item, and the phrase set assignment is therefore valid from 01/01/2005 through 12/31/9999.
A change is made in the phrase item with the change number A5 (valid from 01/01/1999).
If you navigate to the corresponding phrase item with the key date 06/01/1999 after saving, the data valid on this date is displayed. Under
the validity period 01/01/1999 through 12/31/9999 is displayed.
A change is made in the phrase item with the change number A10 (valid from 01/01/2000) and in the phrase set assignment.
If you start with the key date 06/01/2000 after saving, the data valid on this date is displayed in the corresponding phrase item and in the phrase set assignment. Under
the validity period 01/01/2000 through 12/31/9999 is displayed.If you start with the key date 06/01/1999, the data valid on this date is displayed. Under
, the validity period 01/01/1999 through 12/31/1999 is displayed in the phrase item and the validity period 01/01/0001 through 12/31/1999 is displayed in the phrase set assignment.