public static class ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder extends Object
public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder changeNumber(@Nullable String changeNumber)
Original property name from the Odata EDM: ChangeNumber
If you make a change with reference to a change number, or create anobject with a change number, the following functions are at your disposal:The system determines the effectivity parametersThe conditions that the change is effective under can be defined in the change master record as follows:Changes with a date effectivity (valid from date)Changes with parameter effectivity (for example: serial no. effectivity)Log of the changes madeDocumentation for the changesRevision level to indicate the change status of a material or documentChanges released for the different areas in the company.
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder documentType(@Nullable String documentType)
Original property name from the Odata EDM: DocumentType
organizational procedures which result from them.this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder documentInfoRecord(@Nullable String documentInfoRecord)
Original property name from the Odata EDM: DocumentInfoRecord
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder documentPart(@Nullable String documentPart)
Original property name from the Odata EDM: DocumentPart
Design departments, for example, can use document parts to divide up large documents such as design drawings into pages.
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder documentVersion(@Nullable String documentVersion)
Original property name from the Odata EDM: DocumentVersion
A new version is assigned after the original files have been edited in the following processing situations:The new processing status varies from the original in a certain way (for example, text change sin a text file).You want the original processing status to remain the same (for example, documentation of project progress).
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder chgNmbrAlternativeDateID(@Nullable String chgNmbrAlternativeDateID)
Original property name from the Odata EDM: ChgNmbrAlternativeDateID
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder sAPObjectTechnicalID(@Nullable String sAPObjectTechnicalID)
Original property name from the Odata EDM: SAPObjectTechnicalID
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder objMgmtRecdDescription(@Nullable String objMgmtRecdDescription)
Original property name from the Odata EDM: ObjMgmtRecdDescription
You can enter or edit a long text by choosing the Object longtext function in the Extras menu.
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder objMgmtRecdItemUUID(@Nullable UUID objMgmtRecdItemUUID)
Original property name from the Odata EDM: ObjMgmtRecdItemUUID
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder objMgmtRecdLastChangedAt(@Nullable LocalDateTime objMgmtRecdLastChangedAt)
Original property name from the Odata EDM: ObjMgmtRecdLastChangedAt
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder objMgmtRecdLastChangedBy(@Nullable String objMgmtRecdLastChangedBy)
Original property name from the Odata EDM: ObjMgmtRecdLastChangedBy
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder objMgmtRecdCreationDate(@Nullable LocalDateTime objMgmtRecdCreationDate)
Original property name from the Odata EDM: ObjMgmtRecdCreationDate
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder objMgmtRecdCreatedBy(@Nullable String objMgmtRecdCreatedBy)
Original property name from the Odata EDM: ObjMgmtRecdCreatedBy
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder objMgmtRecdObjLastChangedAt(@Nullable LocalDateTime objMgmtRecdObjLastChangedAt)
Original property name from the Odata EDM: ObjMgmtRecdObjLastChangedAt
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder objMgmtRecdObjLastChangedBy(@Nullable String objMgmtRecdObjLastChangedBy)
Original property name from the Odata EDM: ObjMgmtRecdObjLastChangedBy
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder objMgmtRecdObjIsLockedForChg(@Nullable String objMgmtRecdObjIsLockedForChg)
Original property name from the Odata EDM: ObjMgmtRecdObjIsLockedForChg
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder objMgmtRecdObjIsPlanned(@Nullable String objMgmtRecdObjIsPlanned)
Original property name from the Odata EDM: ObjMgmtRecdObjIsPlanned
no master record yet exists for this object andno changes have been entered for the object with this change number
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder objMgmtRecdObjRevisionLevel(@Nullable String objMgmtRecdObjRevisionLevel)
Original property name from the Odata EDM: ObjMgmtRecdObjRevisionLevel
You can assign a revision level when you make a change with reference to a change number with a particular valid-from date.To do this, proceed as follows:Change a MaterialYou can assign a revision level directly during processing in the material master record or in the material BOM header.Change a DocumentWith documents, you can control whether a revision level is assigned, according to the document type. In this case you define a document status and set the release indicator for it. As soon as you process a document of this type, with reference to a change number and set this status for the first time, the revision level is assigned automatically.To enable you to enter a revision level, you first have to define it. To do this choose Logistics -> Central functions -> Engineering change management and then the menu path Revision level -> Material rev. level or Document rev. level.In the Setup control data section you can define how you want the assignment to be made.
this
.public ChangeMstrObMgReDocInfoRecd.ChangeMstrObMgReDocInfoRecdBuilder changeNumberLastChgdDateTime(@Nullable ZonedDateTime changeNumberLastChgdDateTime)
Original property name from the Odata EDM: ChangeNumberLastChgdDateTime
In order to convert local time into a UTC time stamp, which makes it easier to compare times, the local time must be converted according to your time zone. The ABAP command convert is available for this purpose.Even if the time zone that the conversion is based on can be redetermined from Customizing or master data, we still recommend that you save the time zone.The internal structure of the high-resolution UTC time stamp is logically organized in date and time sections in a packed decimal format (YYYYMMDDhhmmssmmmuuun), which depicts the year, month, day, hour,second, millisecond, microsecond and the first decimal of the nanoseconds. Please note that the hardware that is normally used does not fully support a resolution of 100 nanoseconds, which is available in the structure.See also GET TIME STAMPA UTC time stamp in short form is also available.
this
.public ChangeMstrObMgReDocInfoRecd build()
Copyright © 2020 SAP SE. All rights reserved.