Clearing Colocated Cluster Resources

Clear the constraints of a colocated cluster resource.

Prerequisites

  • You have permission Service,Resource(ClusterOperation).

    For more information, see Standard Permissions.

  • Within your system landscape, you have setup a Red Hat Enterprise Linux or SUSE Linux Enterprise high availability extension cluster managed by Pacemaker.

  • You have enabled cluster integration.

    For more information, see Managing Cluster Integration.
  • SAP Host Agent is up and running.

    For more information, see Configuring SAP Host Agent.

  • You have installed SAP Adaptive Extensions Patch 71 (or higher).

    For more information, see SAP Adaptive Extensions.

  • The instance is an SAP HANA database, ABAB Central Services Instance (ASCS instance), or Enqueue Replication Server instance (ERS instance) on Red Hat Enterprise Linux (RHEL) or SUSE Linux Enterprise Server (SLES).

  • Optional: You have configured cluster manager monitoring settings.

    For more information, see Configuring Cluster Manager Monitoring Settings.

Context

Operation Name Clear Colocated Cluster Resources
Technical Operation Name BUILT_IN_CLUSTER_COLOCATED_CLEAR

Procedure

  1. Choose Operations.
  2. Choose Systems from the tabs.
  3. From the Operations dropdown, choose Start of the navigation pathCluster Manager Operations Next navigation step Clear Colocated Cluster ResourcesEnd of the navigation path.
  4. Optional: Select the Set Note checkbox and enter a note to be displayed in the Description column of the instance.
  5. Choose Execute.

Results

SAP Landscape Management runs command crm resource clear <resourceId>.