Example: Control Design Assessment (with Validation) The following process flow takes examples of control design assessment to provide a detailed overview of the assessment process. The process operates by means of statuses being issued by the users involved in the different process steps and follow-up tasks consequently being generated.
This process describes control design assessment with validation of the assessment and with validation of the remediation plan.
Step/Task |
Level(Tab Page) |
Initial Status |
Pushbuttons |
Action /New Status |
|---|---|---|---|---|
In the task
|
Assessment |
|
|
When the user chooses
|
Issue |
|
|
The issue status is automatically changed with the assessment status to
|
|
The person performing assessment validation receives the task
|
Assessment |
|
|
When the user chooses
When the user chooses
|
Issue |
|
|
When the user chooses
When the user chooses
|
|
If the assessment needs to be reworked, the original assessor receives the task
|
Assessment |
|
|
When the user chooses
Consequently, a new review is performed (see previous step). |
Issue |
|
|
The issue status is automatically changed with the assessment status to
|
|
After assessment validation, the person entered as the issue processor receives the task
|
Assessment |
|
All inactive |
|
Issue |
|
|
Processing without remediation plan: Enter comment and choose
Processing with remediation plan: Create remediation plan and choose
|
|
Remediation plan (only for remediation with issue) |
|
|
After saving, status:
|
|
Processing without remediation plan: The processor entered for the issue receives the task
|
Assessment |
|
All inactive |
|
Issue |
|
|
Where required, enter a comment, change the processor, and choose
|
|
Processing with remediation plan: The processor entered for the remediation plan receives the task
|
Assessment |
|
All inactive |
|
Issue |
|
All inactive |
||
Remediation Plan |
|
|
Change remediation plan and choose
|
|
The person performing validation receives the task
|
Assessment |
|
All inactive |
|
Issue |
|
All inactive |
||
Remediation Plan |
|
|
When the user performing validation chooses
When the user chooses
|
|
After validation, the processor for the remediation plan receives the task
|
Assessment |
|
All inactive |
|
Issue |
|
All inactive |
||
Remediation Plan |
|
|
Specify the percentage of completion. Where 100% applies, choose
|
|
Valid for both remediation types: The person who reported the issue receives the task
|
Assessment |
|
|
If the reassessment delivers an unsatisfactory result, retain the negative rating, and report a new issue, or reopen the old issue (see below). In both cases, issue remediation is triggered again with the task
If the reassessment proves successful, choose
|
Issue |
|
|
When
When
|
|
Remediation plan (only for remediation with issue) |
|
|