Example of an evaluation time error
Using the sample report "Custom Functions.rpt", create a new formula that divides 1 by the result of the @Calendar Days Between function. The function would look like this in Basic syntax:
formula = 1/{@Calendar Days Between}
It would look like this in Crystal syntax:
1/{@Calendar Days Between}
Insert this formula into the details section of the report and preview it. You'll get a division by zero error and the formula editor will be invoked with the call stack on the left hand side.