Enabling or Disabling a Follow-On Work Order

Context

Procedure

  1. Access the ConfigPanel through SAP Mobile Add-On.
  2. Click the OData Model Configuration link from the home page of the ConfigPanel.
  3. Select and expand the OData Model Entity Type List at the left of the pane. Select and expand your application from the list.
  4. Select MyWorkOrderHeader. Navigate to the Property List tab and click the Change button.
    1. Delete the ReferenceOrder property by clicking the Delete button to disable.
    2. Enable the ReferenceOrder property by clicking the Add Property button and adding the following:
      • Property Name: ReferenceOrder

      • OMDO Field Name: REFNR (select from a drop-down list)

      • Edm Type: Edm.String (select from a drop-down list)

      • Max Length: 12

      • Conversion Exit: ALPHA

  5. Save your changes.
  6. Click the OData Mobile Data Object Configuration link from the home page of the ConfigPanel.
  7. Choose your mobile application from the dropdown menu at the top of the OData Mobile Data Object Configuration page display, in the Mobile Application Filter field. Choosing your mobile application isn’t a necessary step, but it eliminates objects that aren’t part of your mobile application from the object list.
  8. Click the Field Selection tab.
  9. Expand the OData Mobile Data Object List tree so you can see all of the OData mobile objects.
  10. Select SAM2210_WORK_ORDER_GENERIC from the list. Click the Change button.
  11. Expand the Table - AUFK node, and then locate the REFNR field.
  12. Enable or disable the field by selecting or deselecting the Field Active checkbox.
  13. Save your changes.