Revise Sub Line Items with Changes
Purpose
This process describes the PIP3A8 Request Purchase Order Change business scenario, in which the Buyer wants to revise Sub Line Item(s) in the Product Line Item of an existing purchase order, that has already been sent.
In the PIP3A8 Request Purchase Order Change , the Buyer
Wants to send only changes, with the GlobalPurchaseOrderChangeCode as Changes
Sends only revised Sub Line Item(s) with the Product Line Item
Process Flow
In this process, the RosettaNet Mappings transforms the Product Line and Sub Line Items of the PIP3A8 Request Purchase Order Change message to the appropriate Item and Schedule Line of the CRM IDoc .
For further information, see the OBJECT_TASK section under Identification of Messages .
As per given table, the RosettaNet Mappings are implemented as:
GlobalPurchaseOrderChangeCode mapped to OBJECT_TASK at Header level of CRM IDoc
GlobalActionCode of Product Line Item mapped to OBJECT_TASK at Item level of CRM IDoc
GlobalActionCode of Sub Line Item mapped to OBJECT_TASK at Schedule Line level of CRM IDoc
|
RosettaNet |
SAP CRM |
|---|---|
|
GlobalPurchaseOrderChangeCode = Changes |
Header → OBJECT_TASK = U |
|
Product Line Item → GlobalActionCode = Revise |
Item → OBJECT_TASK = U |
|
Sub Line Item →GlobalActionCode = Revise |
Schedule Line (Ordered) → OBJECT_TASK = U |
Example
Scenario
A purchase order exists with Product Line 10 containing Sub Lines 1 (with 50 pieces) and 2 (with 100 pieces).
The Buyer wants to revise Sub Line 1 of Product Line 10 from 50 pieces to 75 pieces.
The Buyer sends PIP3A8 Request Purchase Order Change with Product Line 10 containing revised Sub Line
The RosettaNet Mappings transforms the Product Line 10 containing Sub Line 1of Request Purchase Order Change to Item 10 with Schedule Line 1 (in CRM IDoc ).
The Seller System changes the sales order and sends an IDoc with the revised Schedule Line 1in Item
The RosettaNet Mappings transforms the revised Schedule Line 1in Item 10 to Purchase Order Change Confirmation message. The transformed message contains the confirmed Product Line 10 with Sub Line