Specifies if the test is scheduled by setting the start date.

The status SCHEDULED appears when you set a Start Date.

You can also start a test by clicking Start icon and the status will change to RUNNING. Such test can be paused by clicking Stop icon or will run until the time defined in the End field.

Indicates if the test can be modified or not.

Click to start the test.

You can click this icon to immediately start the test without specifying the start date.

Click to stop the test from running.

Enter a meaningful name for your test.

This field is mandatory.

Define when the test should start working within your strategy.

This parameter is mandatory. The test should be scheduled to start at least ten minutes from now.

Define when the test should stop working within your strategy.

This parameter is mandatory. The end date cannot exceed 31 days from the start date.

Use the drop-down menu to add a category filter.

You can select multiple categories. If no category is defined, all categories will match.

Consists of the selected Product Mixes.

It maps to a product mix that you can test against another product mix with the A/B Testing functionality to determine the winning one.

Select two different variants to include in the test.

Click to see your test report.