public interface MaterialPlanningDataService
This service enables you to read planning data for materials in Material Requirements Planning (MRP). This includes material master data as well as supply and demand information for a certain period of time.
Reference: SAP API Business Hub
OData Service: | API_MRP_MATERIALS_SRV_01 |
API Version: | 1 |
Communication Scenario: | Production Planning Integration (SAP_COM_0104) |
Scope Items: | Material Requirements Planning (J44) |
Modifier and Type | Method and Description |
---|---|
MRPMaterialFluentHelper |
getAllMRPMaterial()
Fetch multiple
MRPMaterial entities. |
SupplyDemandItemFluentHelper |
getAllSupplyDemandItem()
Fetch multiple
SupplyDemandItem entities. |
MRPMaterialByKeyFluentHelper |
getMRPMaterialByKey(String material,
String mRPPlant,
String mRPArea)
Fetch a single
MRPMaterial entity using key fields. |
SupplyDemandItemByKeyFluentHelper |
getSupplyDemandItemByKey(String material,
String mRPArea,
String mRPPlant,
String mRPPlanningSegment,
String mRPPlanningSegmentType)
Fetch a single
SupplyDemandItem entity using key fields. |
SupplyDemandItemFluentHelper getAllSupplyDemandItem()
SupplyDemandItem
entities.SupplyDemandItem
entities. This fluent helper allows methods which modify the underlying query to be called before executing the query itself. To perform execution, call the execute
method on the fluent helper object.SupplyDemandItemByKeyFluentHelper getSupplyDemandItemByKey(String material, String mRPArea, String mRPPlant, String mRPPlanningSegment, String mRPPlanningSegmentType)
SupplyDemandItem
entity using key fields.mRPPlanningSegment
- mRPArea
- material
- mRPPlant
- mRPPlanningSegmentType
- SupplyDemandItem
entity using key fields. This fluent helper allows methods which modify the underlying query to be called before executing the query itself. To perform execution, call the execute
method on the fluent helper object.MRPMaterialFluentHelper getAllMRPMaterial()
MRPMaterial
entities.MRPMaterial
entities. This fluent helper allows methods which modify the underlying query to be called before executing the query itself. To perform execution, call the execute
method on the fluent helper object.MRPMaterialByKeyFluentHelper getMRPMaterialByKey(String material, String mRPPlant, String mRPArea)
MRPMaterial
entity using key fields.mRPArea
- Number of the MRP area for which material requirements planning should be carried out separately.Constraints: Not nullable, Maximum length: 10
material
- Alphanumeric key uniquely identifying the material.Constraints: Not nullable, Maximum length: 40
mRPPlant
- Key uniquely identifying a plant.Constraints: Not nullable, Maximum length: 4
MRPMaterial
entity using key fields. This fluent helper allows methods which modify the underlying query to be called before executing the query itself. To perform execution, call the execute
method on the fluent helper object.Copyright © 2018 SAP SE. All rights reserved.