Copying Operations/Phases in the Graphic Mode

  1. Choose on the operation overview.

  2. Place the cursor on the operation or phase you want to copy.

  3. Choose Start of the navigation path Edit Next navigation step Object Next navigation step Copy operation End of the navigation path .

The new operation or phase is inserted.

When you copy a phase, the system also creates a relationship between the new and the existing phase. The relationship type is determined by the settings made under Start of the navigation path Settings Next navigation step Defaults Next navigation step Insert nodes End of the navigation path .

Note Note

If necessary, you can change the layout of the operation graphic. For more information, see Adjusting the Operation Graphic and Changing Settings in the Operation Graphic Layout .

End of the note.
  1. If you edit the copied data, double-click the relevant operation or phase in the graphic.

  1. Choose the General data , Standard values , or User fields tab page and enter data as required. For more information, see: