Creating Master Recipes

Use

You use this procedure to create a completely new master recipe.

If a master recipe, routing, or inspection plan already exists in your system with similar data, you can copy this data into the new recipe. In this case, use procedure Creating Master Recipes by Copying .

Prerequisites

The following data has been created in the system:

  • The change master record for master recipes requiring a history

  • A released engineering change order for recipes requiring approval

Caution Caution

The master recipe does not support change master records or engineering change orders with parameter effectivity.

End of the caution.
  • For recipes that you want to assign to a revision level, the corresponding revision level for the material to be produced

  • The resource network of the production line at which you carry out production

Procedure

  1. In the SAP menu, choose Start of the navigation path Logistics Next navigation step Production - Process Next navigation step Master Data Next navigation step Master Recipe End of the navigation path s, Start of the navigation path Recipe and Material List Next navigation step Create. End of the navigation path

  2. Enter data as required and choose .

  3. The recipe header appears.

  4. Enter data as required and choose .

The operation overview appears.

  1. Create the operations and phases for your master recipe.

  2. Editing Operations/Phases on the Operation Overview

  3. Save the master recipe.