Enhancement of Quantity Fields You can subdivide the quantity fields
Yield, Scrap,
and
Rework
into further quantity fields to enable the entry of certain quantities in the confirmation on a targeted basis.
Thus, for example, you can subdivide the
Scrap
field into several scrap fields (such as scrap due to bent parts, scrap due to scratched parts). In addition, you can specify that the system is to generate a corresponding quality notification in this case. See also:
Automatic Generation of Quality Notifications
You can use the enhanced quantity fields in the following transactions:
Enter time ticket for production order (CO11N)
Enter time ticket for process order (COR6N)
Enter confirmation for production order (CO15)
Enter confirmation for process order (CORK)
Display confirmation (CO14/CORT)
Cancel confirmation (CO13/CORS)
You have made the following settings for the desired
order type
in Customizing for
Shop Floor Control
under
on the
Individual Entry General
tab page:
Define quantity layout
To be able to create new quantity fields in a layout, choose the
Define Quantity Layout
function key. The
Define Layout
view appears. Here you specify the name of the layout and enter a description.
In the
Assign Quantities/Defects
area, you can define additional input fields for the three quantity types
Yield, Scrap
, and
Rework
. In the process, note the following:
Create at least one entry for each
quantity type
for which you want to enter quantities.
For each entry, specify the position at which the entry is to be displayed in the confirmation in the
Sequence
field.
For each entry, specify how the quantity field is to be referred to in the confirmation in the
Quantity Description
field.
In the
Display
field, specify whether or not the new quantity field is to be displayed in the confirmation.
Specify how the system is to process the defect count (number of defects).
Specify the
code group, code
, and
cause (reason).
If you specify a code, the system creates a corresponding quality notification for the order.
If you specify a cause (reason), the system can set a user status in the order.
You can define different reasons for deviation/variance. Because the system is only able to save one reason for deviation/variance in a confirmation, when you enter a confirmation it adopts the reason from the first quantity line in which you have recorded a quantity.
Assign quantity layout
You must choose the function key
Assign Quantity Layout
to assign the new quantity layout to a
plant
and an ID.
Set
Header Confirmation
indicator
If you set the
Header Confirmation
indicator, the system also displays the new quantity layout in the confirmation of the order header (CO15/ CORK).
If you use transaction CO11N or COR6N, you must additionally make the following settings for the desired confirmation profile in the IMG activity
Define Single-Screen Entry
:
On the
Area Selection
tab page, choose the
Quantities: Subdivided Quantities
area and define a
pushbutton text
(such as
Quantities
).
You specify whether a certain quantity layout is always to be shown or whether the system is to determine the quantity layout on the basis of the order type of the order to be confirmed in the
Quantity Layout
field on the
Default Settings
tab page.
The system now uses the fields defined by you instead of the standard fields and shows these new fields in the confirmation transactions.
If you carry out the confirmation process using the transactions
Enter Time Ticket for Production Order
(CO11N) or
Enter Time Ticket for Process Order
(COR6N) and have chosen the setting
Order-Type-Dependent Quantity Layout
for the quantity layout, the system is not able to determine the quantity layout to be used until you have entered the
number of the confirmation
or the
order
and
operation numbers
and chosen
Enter
.